Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Is the Digital Modeling Process for Complex UHPC Shapes? Parametric Design and Qinglong Group's Full-Process BIM Technology Application

2026-01-22 14:37:12

Click:

The digital modeling process for complex UHPC forms is the core bridge from concept design to precise construction, involving three major stages: geometry creation, structural analysis, and manufacturing data generation. As an industry leader with 28 years of deep expertise in UHPC, Qinglong Group has distilled a standard digital modeling workflow from hands-on experience on national-level landmark projects such as the red double-curved curtain wall of the Wuhan Han Show Theatre and the wave-shaped roof of the Hainan International Convention and Exhibition Center: first, parametric modeling is carried out with Rhino + Grasshopper, where algorithm-driven generation of complex surfaces (such as NURBS surfaces) ensures the mathematical precision of the form; next, the model is imported into Revit for BIM detailing, integrating multi-disciplinary information such as structure and MEP for clash detection and error analysis; finally, CNC machining code is generated through CATIA or Tekla to directly drive five-axis machines to fabricate molds. In the double-curved panel project for the Shenzhen Yirui Biotechnology Building, this workflow transformed the designers' creative models into producible digital assets, keeping the cumulative installation error of more than 9,000 specially shaped panels within ±3mm and achieving a perfect fusion of art and engineering.

Parametric Design Is the Cornerstone of Form Generation

Parametric design allows complex forms to be generated and modified quickly by adjusting a small number of parameters (such as curvature, density, and proportion). In the "woven" facade design of the China Resources MixC One in Wuxiang, Nanning, Qinglong Group used Grasshopper to write generation algorithms that transformed traditional patterns into three-dimensional surfaces, enabling the efficient design of 2,872 UHPC panels with no two alike. The advantage of this approach lies in efficient iteration: designers can preview the results of different parameters in real time and optimize the scheme. The parametric component library we have built modularizes common form modules, boosting design efficiency on new projects by 50%.

BIM Integration Ensures Buildable Designs

The BIM model is the core of information integration. In the Hainan International Convention and Exhibition Center project, we integrated the UHPC curtain wall model with the main structure, curtain wall framing, and MEP pipeline models, identifying and resolving 137 potential clashes in advance and avoiding on-site rework. The model also incorporates material information (such as compressive strength and fire resistance rating), production data (such as mold numbers), and installation sequences, enabling visualized management of the entire process. Qinglong Group's BIM collaboration platform allows the design, production, and construction parties to work in a unified data environment, reducing information silos.

Digital Manufacturing Enables Precise Conversion

The end point of the digital model is driving production. Software (such as AutoCAD Fabrication) converts the geometric information in the BIM model into G-code recognizable by machines. The five-axis CNC machining centers introduced by Qinglong Group can mill high-precision molds directly from the model (surface profile error ≤±0.1mm). In the translucent UHPC project at Shanghai Century Plaza, digital manufacturing ensured the perfect reproduction of complex textures, with a fidelity of over 95%. The mature application of the digital modeling process is the technical guarantee that enables UHPC to achieve highly demanding forms.

0
What Is the Digital Modeling Process for Complex UHPC Shapes? Parametric Design and Qinglong Group's Full-Process BIM Technology Application
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.