Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

متى أفضل وقت لفك قوالب مكونات GRC؟ معايير التحكم في زمن فك القوالب لـ GRC من تشينغلونغ

2026-01-03 13:44:30

تصفح:

The demolding time of GRC components is determined by strength development, with the optimal demolding strength being 15-20MPa. At a normal ambient temperature of 20℃, ordinary components require 18-24 hours of curing, extended to 36-48 hours in winter. Insufficient demolding strength (below 10MPa) leads to chipped edges and corners, while over-curing (above 24MPa) increases demolding difficulty.

Experimental data show that when the demolding strength is 15MPa, the edge and corner integrity of components reaches 98%; at 10MPa, the damage rate rises to 12%. One art component, demolded prematurely (strength of only 8MPa), suffered a 30% damage rate in relief details, with rework losses exceeding RMB 50,000. In contrast, projects that strictly control demolding strength according to Qinglong GRC standards achieve a component yield rate of 99.5%.

Strength Testing Methods

Same-condition cured test block strength ≥15MPa; rebound hammer test mean ≥15MPa; these methods determine the timing.

Temperature Impact Correction

For every 5℃ drop in temperature, the demolding time is extended by 1/3; these corrections adapt to the environment.

Component Type Differences

Flat panel components can be demolded at 15MPa; complex components require ≥18MPa; these differences should be handled differently.

Demolding Operation Standards

Remove the side molds first, then the bottom mold; use dedicated release agents; these standards prevent damage.

Demolding timing requires scientific judgment. Control under Qinglong GRC standards ensures component integrity.

0
متى أفضل وقت لفك قوالب مكونات GRC؟ معايير التحكم في زمن فك القوالب لـ GRC من تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.