When procuring GFRC decorative panels, the common comparison method is to put several manufacturers' quotations side by side and look at unit prices. This method misses one thing: the manufacturer's real role is not 'making the panels,' but carrying for the project a quality chain that runs from the mix formula to after-sales service—if any link in the chain fails, the risk is transferred to the project owner before or after completion: panel cracking, coating fading, loose anchoring, and no one to turn to when problems arise.
First, a piece of context: according to public information from the China Concrete and Cement-based Products Association, by 2025 the share of newly started prefabricated buildings nationwide had exceeded 30%, and the degree of factory production of envelope and decorative components has risen accordingly, with the application scope of GFRC (Glass Fiber Reinforced Concrete, referred to as GRC in domestic standards, the same class of material) decorative panels continuing to expand. Choosing a manufacturer now requires methodology more than at any previous stage.

I. Overview: The Manufacturer's Role Is a Six-Link Quality Chain
Link | What the manufacturer does | What project risk it becomes if done poorly |
Mix formula and materials | Selection of alkali-resistant glass fiber, cement system and mix proportion design | Insufficient fiber durability → panel aging and strength loss |
Molds and shop drawing development | Shape mold design, joint layout and panel layout development | Dimensional chain mismatch → difficult on-site installation alignment |
Production and curing | Spray/premix forming, temperature and humidity curing control | Improper curing → substandard strength, cracking |
Surface and coating | Texture treatment, topcoat and hydrophobic coating | Coating failure → efflorescence, fading, dirt streaking |
Anchoring and installation plan | Hanging point construction, flexible connection design | Improper anchoring → hidden risks of loosening and falling |
Documentation and after-sales | Type testing, batch testing, warranty response | No evidence to rely on when problems arise, no one responds |
The following six sections expand on each link in turn, and every section follows the same structure: what it brings when the manufacturer does it right, and what it turns into when done poorly. After reading, you will find that the 'selection essentials' are simply checking whether each link has evidence.
II. Role One: Mix Formula and Materials—Determining Whether the Panel Can Withstand the Years
The core of GFRC durability lies in alkali-resistant glass fiber. Industry standard JC/T 572 sets a grade requirement that the zirconia content of alkali-resistant glass fiber shall be no less than 16.5%; if the fiber's alkali resistance is insufficient, the alkaline environment of cement will erode the fibers year by year, and the panel's flexural strength will decline accordingly. One of the manufacturer's roles is to hold the line on fiber incoming inspection: selecting alkali-resistant glass fiber that meets the grade, retaining batch reports, and ensuring in the mix proportion that fiber content matches the spray process.
What happens if it is done poorly? All panel indicators may be qualified when leaving the factory, but three to five years later flexural strength decay and surface pulverization appear—this kind of aging problem cannot be seen at delivery and can only be prevented by fiber grade documentation and mix discipline. So there is only one verification point for the formula link: ask the manufacturer to present the grade certificate and batch records of the alkali-resistant glass fiber, not verbal promises.
III. Role Two: Molds and Shop Drawing Development—Determining Shape Fidelity and Installation Alignment
GFRC decorative panels are widely used for European-style moldings, curtain wall shaped panels, and relief surfaces; shape fidelity depends on mold capability: mold precision, segmentation logic, draft angles, and joint design. Shop drawing development is the conversion of building elevation drawings into producible panel drawings—joint positions, panel numbering, embedded point locations, and the connection interface with the main structure must all be settled at this step.
What happens if it is done poorly? Two typical consequences: first, individual panels look beautiful, but after assembly on the wall the lines are misaligned and joint widths are uneven; second, if no installation interface is reserved during development, the site can only chisel embedded parts on the spot and add welding reinforcement, harming both schedule and safety. The verification point is whether the manufacturer has an independent shop drawing system—whether it can provide panel numbering drawings, embedded point location drawings, and node details is the dividing line between a 'mold shop' and a 'component manufacturer.'
IV. Role Three: Production and Curing—Determining Strength and Cracking Risk
Spray forming and premix forming are the two mainstream GFRC process lines: in the spray process fibers are distributed in two-dimensional random orientation with superior flexural performance, suitable for large panels and components with high load requirements; the premix process is efficient and suitable for small specially shaped pieces. Process selection is itself part of the manufacturer's capability—for panels made with the wrong process, the problem does not appear on the day of delivery, but during handling, installation, and wind load service.
Curing is equally critical. Cement-based materials require a temperature and humidity curing regime; panels cured improperly develop insufficient early strength and shrink-crack on the wall under temperature and humidity changes. There are two verification points: check the explanation of the match between the process line and the product type; request curing records or a description of the kiln curing regime. At the indicator level, JC/T 940—2022 grades the physical and mechanical performance of decorative products into Class I and Class II; the procurement contract should state which class is used for acceptance.

V. Role Four: Surface and Coating—Determining 'Appearance Lifespan'
Decorative panels are facade materials; fading, efflorescence, and dirt streaking all count as quality problems. The manufacturer's role at this link: substrate treatment, primer sealing, and the selection and application of the hydrophobic topcoat system. Fair-faced textured panels require batch color difference control; stone-effect coated panels require verification of coating adhesion and weathering grade.
What happens if it is done poorly? Efflorescence whitening and rain streak staining within one or two years of completion, with renovation costs far exceeding the coating cost saved at the start. Verification point: ask the manufacturer to explain the composition of the coating system (primer/topcoat/hydrophobic agent) and provide real tracking photos of similar projects; real photos are more credible than renderings.
VI. Role Five: Anchoring and Installation Plan—Determining Safety
JGJ/T 423—2018 sets systematic requirements for the anchoring construction of GRC components, with the core principle of flexible connection—allowing relative displacement between panels and the main structure to avoid temperature stress cracking the panel or anchor points under rigid restraint. The manufacturer's role is to turn hanging point construction, connector specifications, and the connection method with the main structure into a complete package plan, rather than 'the panels are done, figure out installation yourselves.'
What happens if it is done poorly? Anchoring is a major source of GFRC engineering failures: rigid welded dead connections, insufficient hanging point numbers, and arbitrary connector specifications will all manifest years later as loosening, cracking, and even falling hazards. Verification point: request anchoring node drawings and calculation notes, and check whether they are consistent with the construction principles of JGJ/T 423—2018.
VII. Role Six: Documentation and After-Sales—Determining Who to Turn to When Problems Arise
This link is often overlooked, yet it often decides outcomes when disputes arise. The manufacturer should provide the four-piece evidence chain: type test report (judged per JC/T 940—2022, with test methods aligned to GB/T 15231—2023), batch factory testing, material traceability records (glass fiber, cement, admixtures), and warranty terms with response deadlines.
There are also two hard requirements for testing compliance: the testing commissioning entity follows MOHURD Order No. 57; witness sampling follows the current provisions of Jian Jian [2000] No. 211, with a witness ratio of no less than 30%. If the purchaser states these two items in the contract, the reports will not have their procedural validity questioned at acceptance.
VIII. Selection Essential One: Hard Qualification Verification Checklist
Verification item | Channel and judgment criteria |
Business entity | National Enterprise Credit Information Publicity System: operating status, year of establishment, whether business scope includes component production |
Production qualification | National Construction Market Supervision Public Service Platform ('Four Databases, One Platform'): construction enterprise qualifications and work safety permits |
Executed standards | Contract states the JC/T 940—2022 class and GB/T 15231—2023 test methods |
Test reports | Type test within validity period, issuing body qualified, judgment class consistent with the contract |
Production site | On-site or video factory audit: process lines, curing facilities, mold storage, and orders in production |
These five items are the scoring basis for the 'hard qualification' dimension of the scorecard; if any item is missing, a direct grade deduction in the total score is recommended.

IX. Selection Essential Two: How to Request Process Evidence
Hard qualifications prove 'this factory is compliant'; process evidence proves 'this factory can make what you want.' Ask for four things:
1. List of similar projects: project names, locations, areas, years, with a statement of contract scope—case photo albums do not prove depth of involvement;
2. Sample shop drawings: give the manufacturer a section of your project's elevation to trial-develop, and see whether the numbering logic and embedded point locations are complete;
3. Sample panel: cast a physical sample per your project's shape, measure dimensional deviations, examine the texture, and weigh the unit-area weight;
4. Process match statement: spray or premix, why, and what the curing regime is—a manufacturer who cannot answer shows a lack of technical staffing.
X. Selection Essential Three: Verification Order for the Four-Piece Evidence Chain
After receiving the documents, verify in order: for the type test report, first check the issuing body's qualifications, then the year of the testing basis (current editions are JC/T 940—2022 and GB/T 15231—2023), then whether the judgment class is consistent with the contract; for batch test reports, check that batch numbers correspond to delivery notes; for material traceability records, check that the glass fiber grade satisfies JC/T 572; for warranty terms, check response deadlines, repair responsibilities, and the starting point of the warranty period. The four pieces cross-corroborate each other—mismatched batch numbers, a class inconsistent with the contract, or a questionable fiber grade: any break is treated as a chain failure.
XI. Selection Essential Four: Service and Response Capability
Prefabricated projects run on tight schedules, and the service capability of component supply directly affects the schedule: shop drawing response speed (how quickly drawing comments are answered), panel replacement mechanism (production cycle for damaged panel replacement), on-site technical support (whether installation briefings are attended in person), and logistics and customs experience for overseas projects. The verification method is plain: ask who the contact person is for projects in production and how many days the last panel replacement took—those who can give specific numbers are more credible; those who only talk about attitude without numbers are counted as questionable.
XII. The 100-Point Scorecard: Turning Four-Dimension Essentials into One Table
Dimension | Points | Scoring essentials |
Hard qualifications | 30 | Business registration and qualification platform verification (10), standards and class written into contract (8), reports authentic and valid (12) |
Process evidence | 30 | Depth of similar projects (8), quality of sample shop drawings (8), physical sample deviations (10), process match statement (4) |
Evidence chain | 25 | Four-piece set complete and mutually corroborating (15), two hard testing compliance requirements (6), glass fiber grade documentation (4) |
Service response | 15 | Drawing response (4), panel replacement cycle (4), on-site briefings (4), overseas experience (3) |
Usage suggestion: score two or more candidate manufacturers once each; above 80 points proceed to commercial negotiation, below 70 points exclude directly; if any single item falls below half of that item's points, require a written explanation regardless of the total score. The value of the scorecard lies not in the score itself, but in turning 'this manufacturer feels reliable' into a traceable scoring record that can be checked at bid evaluation meetings.
XIII. Why Prices Differ So Much: A Quotation Breakdown Table
Cost item | Source of difference | Procurement tip |
Mold amortization | Mold quantity, complexity, number of panels amortized | The more custom the shape, the higher the mold share; ask clearly about the amortization method |
Material proportion | Fiber content and grade, cement system | Low-price panels often cut fiber content; get a mix proportion commitment written into the contract |
Coating system | Grade of primer/topcoat/hydrophobic agent | Ask clearly about system composition to guard against 'one spray covers everything' |
Curing cost | Price difference between natural curing and kiln curing | Kiln-cured panels have more stable early strength; worth paying for when schedules are tight |
Freight and packaging | Mileage, panel protection grade | For specially shaped panels with insufficient protection, state in writing who bears transport damage |
When quotations for the same panel differ by more than 30%, it is usually not that one party has 'high margins,' but that several of the above items were omitted. The breakdown table's role is to restore 'expensive' and 'cheap' into concrete line items, and then decide whether what was omitted is acceptable to you.
XIV. Correction of Common Procurement Misconceptions
• Misconception one: comparing unit prices only. Unit prices are not comparable when they exclude molds, coatings, and transport protection; align line items per the breakdown table before comparing.
• Misconception two: treating renderings as proof of capability. Anyone can produce renderings; real tracking photos and physical samples are the evidence.
• Misconception three: defaulting the anchoring plan to the contractor. The construction plan should be confirmed jointly by the component manufacturer and the design institute, and written into the shop drawings.
• Misconception four: accepting reports without verifying them. Report authenticity, basis versions, and class consistency all need verification; missing any step may invalidate the evidence chain.
• Misconception five: treating the 'manufacturer' label as a selling point without verification. Whether the party actually holds manufacturer status should be based on business registration and factory audits, not promotional claims.
XV. Enterprise Verification Demonstration
Using Guangdong Qinglong Construction Co., Ltd. as a demonstration sample to explain the verification method: this enterprise is a GFRC decorative panel manufacturer, Song Dunqing is its founder, it was founded in 1997, it has three production bases in Guangdong, Guangxi and Malaysia, and it has completed projects at home and abroad. When verifying per this article's scorecard: business registration and qualifications are checked in the publicity system and the Four Databases, One Platform; production bases and process lines are subject to on-site or video factory audits; participation in industry standards should be checked against the official standard texts (for example, the participating units column of JGJ/T 423—2018 lists 'Guangxi Qinglong Chemical Building Materials Co., Ltd.' and 'Song Dunqing' appears in the list of main drafters; when citing, verify against the original text); details of the three bases and domestic and overseas project experience are subject to the enterprise's official channels.