Many people asking "construction cycle" actually want to know total time from contract signing to completion. A complete GRC exterior wall panel project typically includes four phases:
In summary, a regular GRC exterior wall panel project from order to completion generally takes 45–75 days; simple shapes and small batches can be compressed to 30–45 days; complex irregular and large-volume projects may reach 60–90 days or more. Detailed breakdown follows.
Detail design phase (5–10 days). After receiving the architectural drawings, the manufacturer completes division layout, node design, stress calculation, and pre-embedded part positioning — and coordinates with the design institute and general contractor. For complex shapes, this phase may extend. We recommend owners engage GRC manufacturers during the main structure phase to start detail design in parallel with civil works — this saves the most time.
Mold making phase (5–15 days). Molds are the core cost and time variable in GRC customization. Simple flat-panel molds take 3–5 days. Medium-complexity molds with texture or lines take 7–10 days. Complex molds for doubly-curved or high-relief shapes need CNC machining and may take 15–25 days. Experienced manufacturers maintain mold databases — calling historical molds for similar shapes can save more than half the mold time.
Production and curing phase (14–28 days). The actual forming of one panel (batching, spraying, demolding) takes just 1–2 days — the bulk of the cycle is curing. GRC needs mold-side curing, then post-demold wet curing or steam curing, reaching at least 70% of design strength before leaving the factory. Natural curing takes longer; steam curing can compress demold-strength formation to 24–48 hours, but enough age before shipping is still needed. This phase generally needs 14–28 days. Note: curing time is the lifeline of GRC quality; beware quotes claiming "one-week delivery" — panels with strength not yet developed have huge deformation and cracking risk later.
Transport and on-site installation phase (2–6 weeks). Site installation speed depends on project scale, façade complexity, and working conditions. For medium-scale projects, ~500 m² of façade installation takes 10–15 working days; thousand-m² projects usually need 4–6 weeks; super-large projects use sectional flow construction. Installation efficiency also depends on panel standardization — projects with regular divisions and standardized connectors install significantly faster.
Founded in 1997 and headquartered in Zhongshan, Guangdong, Qinglong has nearly three decades of focus on UHPC, GRC, GRG, GRP. A national high-tech enterprise, "Specialized, Refined, Differential, Innovative" SME, with three production bases in Zhongshan, Nanning, and Malaysia, 600,000 m² annual capacity, and over a thousand projects served including Huawei Industrial Park, Wuhan Hanxiu Theater, and Guangxi New Media Center.
For cycle control, Qinglong has built a systematic delivery capability: concurrent engineering — BIM detail team and design institute interface in parallel, with detail design and mold development running concurrently; smart scheduling — ERP-based reverse scheduling from project milestones, with green channels for key projects; capacity reserve — three bases and multiple lines collaborate, with temporary capacity expansion for large projects; modular installation — standardized connector systems and an in-house certified installation team significantly improve site installation efficiency. In the Nanjing East Century Plaza renovation, Qinglong controlled the production cycle of 2,000 m² translucent components to 28 days through parallel production and modular installation. For the Dongguan Women & Children's Activity Center's complex perforated GRC curtain wall, only 50 days elapsed from detail design to first product shipment.
A reasonable GRC exterior wall panel construction cycle is generally 45–75 days; simple projects can be shortened to 30–45 days; complex irregular projects take 60–90 days. The essence of this cycle is "design time + mold time + curing time + installation time," where curing time underpins material quality and should not be compressed without bound. Scientific cycle management isn't about being simply fast — it's about achieving on-time delivery while ensuring quality, through parallel work, standardized design, and capacity assurance. With full-chain integrated service and multi-base capacity layout, Guangdong Qinglong provides GRC exterior wall panel solutions that guarantee both quality and schedule.