Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-02-03 16:12:28
Click:
Technical support services from a GRC manufacturer are an important guarantee of project success, with a value far beyond the product itself. Qinglong Group's technical support runs through the entire process of "pre-project consultation, design development coordination, production process monitoring, and on-site installation guidance," providing customers with comprehensive professional technical support. Our technical support team is composed of senior engineers, BIM engineers, and installation experts, ensuring that every stage receives professional technical support.
During the pre-project consultation stage, Qinglong's technical support is mainly reflected in scheme optimization and feasibility analysis. Our engineers proactively participate in project discussions, providing customers with professional advice from the perspectives of material properties, production processes, and installation feasibility. In the early stage of the Xiangshan Science and Technology Park project in Longhua, Shenzhen, through technical analysis, we helped designers optimize the jointing design and connection nodes of the GRC panels, which not only ensured the visual effect but also improved installation efficiency, saving the project substantial costs.
The design development stage is the core of technical support. Qinglong has a professional BIM team capable of transforming architects' creative concepts into implementable construction drawings. Using parametric design tools such as Rhino and Grasshopper, we perform optimization analysis on complex curved surfaces to ensure the manufacturability of every component. In the "Guancao" woven-texture facade project for the Dongguan Women and Children's Activity Center, our technical team used digital design to convert complex three-dimensional weaving patterns into producible GRC components, perfectly realizing the design vision.
Particularly worth emphasizing is the importance of on-site technical support. Qinglong assigns dedicated project managers and technical supervisors to every large-scale project, following up on the installation process from start to finish. Our technical personnel not only guide the installation team in proper construction but also promptly adjust plans according to actual site conditions. During the construction of the wave-shaped roof of the Hainan International Convention and Exhibition Center, faced with the challenge of complex curved-surface installation, our technical team developed a dedicated positioning system and installation technique on site, ensuring the precise installation of the 120,000-square-meter roof. This depth of technical support is the key guarantee of success for GRC projects.