Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-30 18:11:06
Click:
UHPC manufacturers' BIM technology application capabilities are crucial in modern construction projects, directly affecting design development precision, production quality control, installation accuracy, and overall project benefits. Qinglong Group applies BIM technology comprehensively throughout the entire design, production, and construction process. In the Nanning New Media Center double-curved curtain wall project, BIM model guidance enabled the "zero-error" installation of nearly 10,000 irregularly shaped panels. This digital capability has become a key indicator for evaluating a manufacturer's technical level.
The application value in the design development stage is significant. BIM technology enables parametric design and optimization of complex shapes. Qinglong's BIM team uses software such as Rhino and Grasshopper for 3D modeling, automatically generating component fabrication drawings and bills of materials. In the Wuhan Han Show Theatre project, we performed virtual pre-assembly using BIM models, identifying and resolving more than 200 design conflicts in advance, avoiding on-site rework.
Precision control in the manufacturing stage relies on BIM data. BIM models can directly drive CNC machining equipment. Qinglong's five-axis machining centers obtain machining data directly from BIM models, ensuring mold precision of ±0.2mm. Our production management system seamlessly connects with the BIM platform, achieving data integration from design to manufacturing.
The guiding role in the construction and installation stage is indispensable. BIM models provide precise installation positioning information. Qinglong uses tablets on installation sites to display BIM models, guiding workers in precise positioning. In the Shenzhen Pingshan High-tech Zone project, installation sequence diagrams generated from BIM models improved installation efficiency by more than 30%.
The collaborative benefits throughout the entire process are evident. The BIM platform promotes efficient collaboration among all participants. Qinglong has established a project collaboration platform, allowing the design, production, and construction parties to share models and data in real time. This collaborative model significantly reduces information errors and communication costs, creating greater value for projects. Manufacturers with strong BIM application capabilities can provide customers with more precise and efficient services.