Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Later-Stage Maintenance Do UHPC Components Require?

2026-01-29 17:27:42

Click:

UHPC components are renowned for their "ultra-high durability and near maintenance-free" performance, but this does not mean they can be completely left unattended. Scientific and appropriate post-installation maintenance is a necessary measure to ensure optimal performance throughout their design service life. Based on long-term tracking of UHPC projects exceeding ten years, such as the Hainan International Convention and Exhibition Center and the Wuhan Han Show Theatre, Qinglong Group has established a full life-cycle maintenance system for UHPC components featuring "routine inspection and prevention as the primary approach, supplemented by targeted repairs". Its core work can be summarized into four modules: "periodic inspection, cleaning and care, joint maintenance, and damage repair". Compared with traditional materials requiring frequent maintenance, UHPC offers long maintenance cycles and minimal workload, resulting in extremely low overall maintenance costs.

Establishing a Periodic Inspection System

Systematic inspection is the first step of maintenance. Qinglong recommends the following inspection schedule: a first comprehensive inspection in the first year after completion, followed by a routine inspection every 2-3 years, and an in-depth inspection entrusted to a professional agency every 5-10 years (or after extreme events). The inspection covers: 1) Visual inspection: checking the surface for staining, discoloration, wear, and cracks; 2) Connection system inspection: checking anchors and bolts for looseness or corrosion (even stainless steel still requires checking); 3) Sealing system inspection: checking panel joint sealant for aging, cracking, or debonding; 4) Drainage system inspection: ensuring drainage holes are unobstructed. For large projects, Qinglong can assist clients in establishing digital inspection records.

Scientific Cleaning and Surface Care

The dense UHPC surface resists dirt, and rainfall is usually sufficient to keep it clean. For stubborn stains (such as bird droppings or industrial dust), professional cleaning is recommended every 3-5 years. Use neutral detergents and low-pressure water jets, and avoid strong acids and alkalis. For components with special coatings (such as fluorocarbon paint), renovation cycles can be planned according to the coating's service life (typically 10-15 years). Qinglong does not recommend applying incompatible coatings arbitrarily on UHPC surfaces, as this may compromise their breathability and surface texture.

Sealant Maintenance and Renewal

The weather-resistant sealant at panel joints is the weak link of the UHPC curtain wall system, with a design life of typically 10-20 years. The focus of maintenance is to replace the sealant before it ages and fails, preventing rainwater infiltration. Qinglong recommends sampling and testing when the sealant reaches mid-life (e.g., 8-10 years after installation) to assess its elasticity and adhesion, and to formulate a replacement plan. When replacing, a high-performance silicone sealant compatible with both UHPC and the original sealant must be selected.

Damage Assessment and Professional Repair

Although the probability is extremely low, components may still be damaged by accidental impacts or similar incidents. Once discovered, the extent of the damage should be assessed immediately. For non-structural surface scratches and chips, the specialized repair mortar provided by Qinglong can be used, and the repaired color and texture will closely match the original component. For damage involving structural safety, assessment by professional engineers is mandatory, along with a reinforcement or replacement plan. Qinglong Group provides lifetime technical consultation and paid repair services to give clients complete peace of mind.

In summary, the post-installation maintenance of UHPC is a "low-cost, long-cycle, high-benefit" management model. By establishing a simple maintenance regime, this high-performance material can be ensured to continuously provide safety and aesthetic protection for buildings over decades or even a century.

0
What Later-Stage Maintenance Do UHPC Components Require?
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.