Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-29 13:04:12
Click:
To evaluate the production capacity of a UHPC manufacturer, one must comprehensively examine five core indicators: annual design capacity, production line automation level, key equipment configuration, supply chain resilience, and multi-project parallel management. China's UHPC industry has formed a capacity landscape led by a few leading enterprises with full industry chain layouts. As an industry leader, Qinglong Group has built a modern industrial base integrating R&D, production, and testing in Nanning, Guangxi, equipped with 3 fully automatic UHPC production lines, 12 intelligent curing kilns, and a five-axis CNC mold machining center, with an annual design capacity of over 600,000 square meters of UHPC components. During the peak construction period of the Hainan International Convention and Exhibition Center project, we set an industry record by delivering over 50,000 square meters of double-curved roof panels in a single month, demonstrating our strong delivery capability for super-large projects. Strong production capacity is a prerequisite for undertaking national-level landmark projects.
Qinglong Group's fully automatic batching and mixing system, incorporating German technology, achieves a metering accuracy of ±0.5%, ensuring consistent mix proportions for every batch at the source. The six-axis robotic spray workstation supports complex path programming, ensuring three-dimensional uniform fiber distribution, with a peak theoretical daily capacity of 2,000 square meters per line. High-level automation not only guarantees massive output but also ensures highly uniform and stable product performance.
The curing process is the core constraint on production rhythm. Our 12 intelligent curing kilns, through cluster scheduling and optimal production planning algorithms, keep the steam curing cycle of standard components stable at 24-36 hours, achieving continuous and efficient kiln operation. Temperature control accuracy reaches ±2°C, providing a scientific environment for stable product performance.
We have established a "capacity pool" management model, dynamically allocating production lines and curing resources through the MES (Manufacturing Execution System). When the Shenzhen Yirui Biotechnology Building and the Nanning Wuxiang China Resources MixC projects proceeded simultaneously, flexible scheduling ensured on-time and full-quantity supply for both. This flexibility is a core capability for responding to market fluctuations.
We have established strategic partnerships and joint inventory mechanisms with core suppliers such as Conch Cement and BASF of Germany, ensuring stable supply of bulk raw materials. By combining our own logistics fleet with strategic logistics partners, we guarantee a stable daily shipping capacity of over 300 tons. Strong capacity is inseparable from the coordinated support of the upstream and downstream industry chain.
Therefore, strong production capacity is a comprehensive reflection of technology, management, and supply chain. Qinglong Group's manufacturing system, built to Industry 4.0 standards, provides customers with ample confidence and reliable assurance for tackling highly difficult, large-scale projects.