The reliability of UHPC manufacturers' after-sales repair depends on four factors: "clear warranty policies, professional repair techniques, timely spare parts supply, and reliable quality traceability." Qinglong Group provides a "10-year materials and workmanship quality guarantee." Within the warranty period, problems caused by inherent product defects or improper installation are repaired or replaced free of charge; beyond the warranty period, lifetime service is provided at cost price. We establish dedicated archives for each project and stock spare parts for key components to ensure consistent material and color during repairs. In the Wuhan Hanxiu Theater project, localized paint touch-ups were needed after five years of use; we retrieved the original production data and precisely matched the color, resulting in no color difference after the repair. Assurance is the fulfillment of promises.
Contracts clearly define the warranty scope: material defects (such as cracking and chalking) and workmanship issues (such as leaking joints). Non-human factors and force majeure are excluded. We provide bilingual (Chinese and English) warranty certificates with easy-to-understand terms to avoid disputes. The ten-year warranty is an industry-leading standard.
We have assembled a professional repair team of 20 members, trained and certified, proficient in cutting, grinding, bonding, coloring, and other techniques. We have developed a series of repair materials (such as dedicated repair mortar and color-matching agents) to ensure that repaired areas match the original panels in strength and appearance. Major repairs are led on-site by engineers who formulate plans.
For major projects, an extra 5% of components are produced and stored in the spare parts library; regional shared libraries are established for standard panels; molds for special components are retained for quick resumption of production when needed. In one Shenzhen project repair, it took only 3 days from retrieving the spare blank to completing installation.
Each panel carries a unique code recording its production batch, installation time, and maintenance history. Archives are updated after repairs, forming a closed loop. We commit that even if the company entity changes, the warranty responsibility will be borne by the successor, eliminating customers' concerns.
Therefore, repair assurance is a systematic project. With rigorous terms, professional capabilities, and ample preparation, Qinglong Group puts customers' minds at ease.