Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-28 17:30:48
Click:
The after-sales response time of a UHPC manufacturer is a key indicator of its service effectiveness and requires tiered management based on "issue severity, distance factors, and handling procedures." Drawing on 28 years of service network development, Qinglong Group has set the following response standards: inquiries are answered within 2 hours, general technical issues receive solutions within 24 hours, and for on-site emergencies requiring immediate handling (such as component detachment or leakage), technicians arrive at the project site within 12 hours. In the Nanning Wuxiang China Resources MixC One project, a panel's corner was damaged during transport; within 4 hours of receiving notice, we dispatched personnel for an on-site inspection and completed the repair within 8 hours, earning high recognition from the owner. Rapid response is a catalyst for trust.
We developed the "Qinglong Yunwei" WeChat mini program, where customers upload photo and text descriptions and the AI system makes a preliminary assessment and assigns a severity level. Inquiries (such as material usage) receive automatic replies from the knowledge base; technical issues are transferred to engineers for answers within 24 hours; on-site issues generate work orders dispatched to the nearest location. In 2023, minor issues resolved online accounted for 45%, with an average response time of 2 hours.
We have established technical service centers in key regions such as East China (Shanghai/Hangzhou), South China (Shenzhen), Central China (Wuhan), and Southwest China (Chengdu), stocked with commonly used spare parts. Through system optimization, we ensure that over 90% of areas can be reached within 12 hours. For remote areas, we adopt a model combining air travel and local partnerships, taking no more than 24 hours.
An AR remote guidance system is used: on-site personnel wear smart glasses while headquarters experts annotate the live view in real time to guide handling. Simple issues are resolved remotely, and for complex issues, the situation is brought under initial control before the expert arrives. On a project in Dongguan, through AR guidance, a worker repaired a joint defect in 30 minutes, avoiding a second dispatch.
Response time is included in KPI assessments, with data analyzed monthly to optimize processes. In 2023, the average on-site response time was shortened to 8 hours, a 20% improvement over 2022. We pledge to compensate with corresponding service vouchers for every hour of delay.
Therefore, quality after-sales service requires systematic support. Through digitalization and networking, Qinglong Group ensures that customer needs are responded to the moment they arise.