How Should Temporary Supports Be Set Up for GRC Panel Installation? Construction Safety and Qinglong Group's Standardized Operation Procedures

2026-01-26 17:58:42

Click:

The installation of temporary supports during GRC panel installation is a key technical measure for ensuring construction safety, controlling installation accuracy, and preventing deformation damage to components. It must follow four basic principles: "stable and reliable, easy to adjust, safe to remove, and protective of finished products." The temporary support system must be specially designed according to "panel weight, panel type, installation height, and working environment." Qinglong Group has developed standardized support schemes through installing super high-rise buildings and large shaped panels: for facade hanging panels, a movable support frame with "diagonal brace + casters" is used; for ceiling panels, a top support system with "adjustable screw rod + support beam" is used; and all support points in contact with the panel surface must be padded with flexible materials. In the installation of hyperbolic panels at the Nanning New Media Center, the dedicated support frames we designed achieved fine adjustment accuracy of ±5mm, with a turnover utilization rate of over 95%. Standardized temporary supports are the "scaffolding" of high-quality installation.

Bearing Capacity and Stability Calculation of the Support System

Temporary supports must undergo load calculations, and their bearing capacity safety factor should not be less than 2.0. The combined effects of panel weight, construction loads (such as workers and tools), and wind loads (for outdoor work at heights) must be considered. The height-to-width ratio of the support frame must meet stability requirements, and guy wires should be set up when necessary. Qinglong Group provides standard support schemes and calculation documents for each typical panel type to ensure absolute reliability.

Scientific Arrangement of Support Point Positions and Quantities

Support points should be set at mechanically reasonable positions on the panel, usually near panel edges or reinforcing ribs, to avoid excessive bending moments in the panel. For large panels (area >4㎡), no fewer than 3 support points are required. The height of support points should be independently fine-adjustable to accommodate uneven substrates. We use threaded screw jacks to achieve precise elevation control.

Flexible Contact Between Supports and Components and Protection of Finished Products

All support parts in direct contact with GRC panels (such as screw jacks and clamps) must be wrapped with rubber pads or EVA foam to prevent hard-on-hard contact damage to panel edges or surface coatings. Extra care is required for panels with special finishes (such as polished or stone-imitation surfaces). The support system itself should be easy to install and remove, and the operation process should not damage components already in place.

Standardization and Reusability Improve Efficiency

Using modular, tool-based temporary support systems, such as plug-in steel pipe frames and standard height-adjustable columns, can greatly improve installation and removal efficiency and reduce costs. Qinglong Group promotes the use of such standardized support tools and inspects and maintains them to ensure safety in every use.

Attaching importance to temporary supports means attaching importance to construction safety and engineering quality. Qinglong Group treats temporary support design as an important part of the installation scheme, using rigorous details to ensure the smooth implementation of projects.

0
How Should Temporary Supports Be Set Up for GRC Panel Installation? Construction Safety and Qinglong Group's Standardized Operation Procedures
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.