Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How Do UHPC Facades Compare to Traditional Tile Facades in Construction Time? The Efficiency Revolution and Qinglong Group's Rapid Construction System

2026-01-26 17:18:24

Click:

UHPC facade systems offer significant efficiency advantages over traditional tiled facades in terms of construction schedule, typically reducing the overall construction period by 40%-60%. This is mainly attributable to four key characteristics of UHPC: "factory prefabrication, dry installation, high precision, and fewer processes." Taking a 10,000-square-meter facade as an example, traditional wet tile application (including substrate preparation, tiling, grouting, and cleaning) usually takes 60-90 days; whereas with a UHPC curtain wall system (including surveying and setting out, keel installation, panel hanging, and sealant application), the construction period can be controlled within 30-45 days. In the Shenzhen Yirui Biotechnology Building project, we adopted UHPC curtain wall panels with a daily installation volume of 300 square meters, shortening the construction period by nearly two months compared with the original tile scheme, creating enormous value by enabling the owner to put the building into use ahead of schedule. The schedule advantage is one of the core competitive strengths of UHPC industrialized construction.

Factory Prefabrication Maximizes On-Site Work Efficiency

Traditional tiles require multiple wet processes to be completed on site, such as cutting, mixing mortar, tiling, and grouting, which are heavily affected by weather and involve complicated procedures. UHPC panels complete all high-precision machining and surface treatment in the factory, with only modular hoisting on site—like "building blocks"—converting a large amount of uncontrolled on-site work into controllable factory production. Construction is minimally affected by weather and can proceed around the clock.

Dry Installation Simplifies the Process Flow

UHPC adopts a dry-hanging system in which panels are directly fixed to the keel via connectors, eliminating the need for cement mortar bonding and curing waiting time. Installation is fast, with clear procedures, minimal cross-trade work, and simple management and coordination. In contrast, wet tile application involves multiple interleaved processes, places high demands on worker skills and on-site management, and is prone to schedule delays caused by quality rework.

High Precision and Minimal Adjustment Reduce Ineffective Work Hours

The dimensional tolerance of UHPC panels is controlled at the millimeter level. During installation, perfect alignment can be achieved simply by fine-tuning with three-dimensionally adjustable hangers, with almost no on-site cutting or trimming required. Traditional tiles involve extensive on-site cutting and complex layout and joint alignment, which easily leads to error accumulation, making adjustments time-consuming and labor-intensive.

Reduced Later Maintenance and Cleaning Time

UHPC panels undergo surface treatment (such as self-cleaning coatings) before leaving the factory, requiring only simple cleaning after installation. Tiles require special cleaning after installation and are prone to later repair issues such as hollowing and detachment. The high reliability of the UHPC system reduces rework and repair time caused by quality issues at the source.

Therefore, choosing a UHPC facade means not only faster construction, but also a more controllable project schedule, lower on-site management costs, and an earlier return on investment. Qinglong Group's rapid installation system brings out the full schedule advantage of UHPC.

0
How Do UHPC Facades Compare to Traditional Tile Facades in Construction Time? The Efficiency Revolution and Qinglong Group's Rapid Construction System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.