The delivery lead time for custom UHPC panels is a systematic engineering process consisting of four stages—design development, mold fabrication, production and curing, and logistics transportation—typically requiring 45-60 days to complete the standard process. As an industry leader with 28 years of full-chain UHPC service experience, Qinglong Group has established a precise schedule control system based on practical data from major projects such as the Shenzhen Yirui Biotechnology Building and the Hainan International Convention and Exhibition Center: design development 7-10 days (including BIM model optimization), mold fabrication 15-25 days (CNC machining + precision verification), mass production and curing 10-15 days (including steam curing), and logistics installation 5-10 days. In the Nanning Wuxiang China Resources MixC One double-curved curtain wall project, we compressed the delivery lead time for 287 shaped panels to 38 days through a precast component database and parallel operation mode—30% shorter than the industry average. Delivery lead time is the touchstone of a manufacturer's overall strength.
After receiving design drawings, Qinglong's development team completes model review, structural calculations, anchor point optimization, and process feasibility analysis within 7 days. For complex projects such as the red double-curved panels of the Wuhan Han Show Theatre, we use 3D laser scanning to verify civil structures and avoid on-site installation conflicts in advance. The BIM collaboration platform ensures seamless integration of design, production, and construction data, preventing rework and delays at the source.
Single-curved panel molds require 7-10 days (3-axis CNC machining), while double-curved panel molds require 15-25 days (5-axis CNC machining). Qinglong's Nanning production base is equipped with German DMG 5-axis machining centers, with mold surface precision controlled within ±0.5mm. Through modular mold design and parametric programming, we have increased the fabrication efficiency of complex curved molds by 40%.
Standard panels cured with steam (80°C × 24h) can have the curing period shortened to 3 days, while shaped panels require 7-10 days of natural curing. Qinglong's intelligent curing kilns achieve precise temperature and humidity control (temperature difference ≤2°C), ensuring that every batch of UHPC panels maintains strength above 150MPa. 100% dimensional and color difference inspections are performed before shipment, with a committed pass rate of 99.5%.
Custom steel transport racks are designed for ultra-thin panels (≤20mm), and vacuum suction loading is used to prevent damage. A nationwide warehousing network supports simultaneous shipments from multiple locations, and professional hoisting teams provide on-site guidance for heavy components. During the cross-region transportation for the Shanghai Astronomy Museum project, we ensured zero-damage delivery of artwork-grade components through GPS tracking and vibration monitoring.
Scientific schedule management is not only about efficiency but also a guarantee of quality. Through databases accumulated over 28 years and standardized processes, Qinglong Group tailors the optimal delivery solution for each project.