Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Are the Dimensional Deviation Control Standards for UHPC Components? Precision Management and Qinglong Group's Tolerance System

2026-01-24 15:57:48

Click:

Dimensional deviation control standards for UHPC components must be established in tiers according to "component type, installation location, and building grade", generally following the principle that "factory standards are stricter than national standards, and critical areas stricter than general areas". Qinglong Group's internal control standards are: length deviation ±2mm/2m, flatness ≤2mm/2m, thickness deviation ±1mm, and diagonal difference ≤3mm; whereas the national standard (JC/T 940) allows a deviation of ±3mm/2m. In the Wuhan Han Show Theater double-curved panel project, through CNC molds (precision ±0.1mm) and 3D scanning inspection, we kept the cumulative installation error of 9,000 shaped panels within ±5mm, achieving a perfect curved surface. Dimensional accuracy is a direct reflection of the industrialization level of UHPC.

Factory internal control standards are the cornerstone of quality

Qinglong Group classifies components into three precision grades: Grade A (critical visual areas) with deviation ±1.5mm, Grade B (general areas) ±2mm, and Grade C (concealed areas) ±3mm. Production lines are equipped with laser trackers for real-time correction of mold positions.

Inspection technology is the guarantee of control

Coordinate measuring machines (precision ±0.01mm) are used for sampling inspection, while large panels undergo 100% laser scanning inspection. In the Hainan Convention and Exhibition Center project, each panel carries a QR code, and scanning it reveals complete dimensional data.

Pre-control and compensation of installation errors

A 2mm installation adjustment allowance is reserved at the design stage; BIM pre-assembly is used to detect conflicts. Qinglong Group provides dedicated adjustment hangers that allow ±5mm on-site adjustment.

Precision control is a systematic engineering effort. Qinglong Group manages the entire process from design to installation digitally, ensuring components fit together seamlessly.

0
What Are the Dimensional Deviation Control Standards for UHPC Components? Precision Management and Qinglong Group's Tolerance System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.