Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-01-23 15:02:00
Click:
Whether a GRC manufacturer's output can meet project requirements depends on four capabilities: "design capacity, scheduling flexibility, supply chain resilience, and emergency response." Qinglong Group's Nanning production base has a designed annual capacity of 600,000 square meters. Through lean production management, optimized equipment scheduling, and supply chain coordination, actual capacity flexibility can reach ±20%, enabling parallel production for 3-5 large projects (each with an area ≥20,000 square meters) simultaneously. During the peak period of the Hainan International Convention and Exhibition Center project, through production line optimization (15% efficiency improvement) and two-shift production, we achieved a record monthly output of over 80,000 square meters, ensuring the on-time delivery of the 120,000-square-meter roof. Output assurance is not merely production capability, but a comprehensive reflection of resource coordination and risk management capabilities.
Qinglong Group has 5 automated production lines with a theoretical daily capacity of over 2,000 square meters. Through scientific production planning, standard panels and shaped panels are rationally matched to maximize equipment utilization. Ample capacity reserves are the foundation for meeting large-scale demand.
We have established an "order pool" management model that consolidates the production of similar panel types to reduce mold changeover time. A green channel for urgent orders reserves 10% of capacity to respond to unexpected demand. In a commercial complex project in Shenzhen, the client temporarily added an order of 5,000 square meters. Through flexible scheduling, we completed the supply within 15 days without affecting the overall schedule.
Deep collaboration with raw material suppliers and the implementation of joint inventory management ensure a stable supply of raw materials. Strategic partnerships with multiple logistics companies ensure that products are delivered to the site on time. A strong supply chain is the guarantee for converting capacity into actual supply.
Capacity assurance is the prerequisite for fulfilling commitments. Through scientific capacity planning and flexible scheduling mechanisms, Qinglong Group ensures reliable product supply for clients regardless of project size or schedule urgency, clearing obstacles for smooth project implementation.