Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How to Improve the Production Efficiency of Double-Curved GRC Panels? Intelligent Manufacturing and Qinglong Group's Process Optimization System

2026-01-22 13:13:30

Click:

Improving the production efficiency of double-curved GRC panels requires systematic optimization across three dimensions—"digital design, concurrent engineering, and flexible manufacturing"—which can shorten the traditional 45-60 day cycle to 25-35 days. In the 120,000-square-meter roofing project at the Hainan International Convention and Exhibition Center, Qinglong Group achieved a daily output of 2,000 square meters and a 3-fold increase in productivity through BIM-based front-loaded clash detection (resolving 137 design conflicts), modular mold design (reducing the number of molds by 40%), and a U-shaped production line layout (cutting logistics distance by 60%). Efficiency improvement is not simply acceleration, but the elimination of waste through technological and management innovation.

Design standardization is the foundation of efficiency. Establish a curved panel library and consolidate components with similar curvatures. In the Wuhan Han Show Theatre project, parametric design optimized 9,000 panels into 8 standard series, raising the mold reuse rate by 50%. Platform-based design is adopted, with universal base modules and localized customization.

Production process reengineering is the key. Introduce a MES system to achieve integrated "order-scheduling-manufacturing" operations. Qinglong Group's Nanning production base adopts mixed-flow production, running large double-curved panels and standard panels on the same line, with equipment utilization reaching 85%. The steam curing cycle is shortened by 20% through an optimized heating curve.

Supply chain collaboration accelerates delivery. Establish direct data connections with mold factories for remote transmission of CNC code. In the Shenzhen Yirui project, supply chain collaboration reduced raw material inventory by 30% and shortened the delivery period by 10 days. Efficiency improvement is a reflection of system capability.

0
How to Improve the Production Efficiency of Double-Curved GRC Panels? Intelligent Manufacturing and Qinglong Group's Process Optimization System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.