What Risks Require Key Control in Mass UHPC Construction? Thermal Crack Prevention and Qinglong Group's Engineering Management System

2026-01-20 14:58:54

Click:

Mass UHPC construction requires focused control of three core risks: thermal cracks, shrinkage cracks, and layer segregation, which stem from its material characteristics of low water-binder ratio, high binder content, and concentrated hydration heat. In super-large-volume projects such as the 12,000 m³ cast-in-place roof at the Hainan International Convention and Exhibition Center and the 9,000 m² precast panel installation at the Wuhan Hanxiu Theater, Qinglong Group applied a system of 'material cooling + layered pouring + intelligent temperature control' to keep the peak core temperature within 70°C, the internal-external temperature difference ≤20°C, and the crack occurrence rate below 0.5%, achieving safe construction of mass UHPC.

Thermal crack prevention is the top priority. We adopt measures such as low-heat cement (sulphoaluminate cement), adding ice water (placing temperature ≤15°C), and embedding cooling water pipes (spacing 1 m) to reduce temperature rise. The temperature monitoring system deploys one monitoring point every 50 m² with real-time alerts. In the construction of a foundation slab in Shenzhen, by optimizing the mix proportion (binder content ≤800 kg/m³), the peak temperature was reduced from 85°C to 65°C, preventing thermal cracks.

Shrinkage cracks require comprehensive control. Magnesium oxide expansion agent (dosage 6-8%) is added to compensate for cooling shrinkage; post-cast strips (spacing ≤20 m) are set to release restraint stress; and thermal and moisture curing (film covering + water spraying) is maintained for 14 days. We developed an internal curing technology by adding saturated lightweight aggregate (3%), reducing 28-day shrinkage to 200 μm/m. Layered pouring prevents segregation: each pour thickness ≤500 mm with intervals ≤2 h, using high-frequency vibration to ensure compaction.

Risk management must cover the entire process. Qinglong Group establishes dedicated construction plans and performs thermal calculations and crack prediction. Through 28 years of practice, we have developed a mature mass UHPC construction guide to provide technical assurance for our clients.

0
What Risks Require Key Control in Mass UHPC Construction? Thermal Crack Prevention and Qinglong Group's Engineering Management System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.