Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How to Control the Splicing Precision of Multi-Curved UHPC Forms? 3D Spatial Coordination and Error Allocation System

2026-01-16 19:59:36

Click:

Controlling the jointing precision of multi-curved UHPC forms is the core technology for ensuring a building's visual continuity, and it must be achieved through the systematic approach of "unified datum - error allocation - real-time correction." Qinglong Group sets its jointing precision standards at a joint width error of ≤ ±1.5mm, an adjacent panel surface height difference of ≤ 2mm, and an overall surface smoothness deviation of ≤ 3mm/5m. Through total station setting out (accuracy ±2mm) and an adjustable connection system, it achieved the perfect alignment of tens of thousands of double-curved panels in projects such as the Nanning Wuxiang China Resources MixC.

A unified datum is the foundation of precision. A project-wide global coordinate system is established, actual substrate data are captured through 3D laser scanning, and correction parameters are generated by comparison with the BIM model. Qinglong Group uses Leica total stations to set up the control network, keeping installation datum point errors within ±1mm. For curved forms, dedicated positioning templates are fabricated to ensure the accurate spatial orientation of every panel. In the Hainan International Convention and Exhibition Center project, digital pre-assembly detected and corrected 137 potential clash points.

The error allocation system is scientific and rational. Total error is broken down into four parts—mold fabrication (±0.5mm), production deformation (±1mm), surveying and setting out (±1mm), and installation adjustment (±1.5mm)—with tolerance limits set for each stage. Statistical process control (SPC) is applied to monitor error accumulation and ensure that final precision meets standards. Through rigorous process control, Qinglong Group keeps the error dispersion coefficient within 5%.

Real-time correction safeguards the final result. During installation, a laser tracker monitors placement accuracy in real time, with fine adjustments made via 3D adjustable brackets (adjustment range ±5mm). Standard spacer blocks control joint width, and sealant is applied with uniform thickness. Through this closed-loop control system, the multi-curved UHPC curtain wall delivers a smooth, flawless visual effect.

0
How to Control the Splicing Precision of Multi-Curved UHPC Forms? 3D Spatial Coordination and Error Allocation System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.