Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Is the Mechanism by Which Steel Corrosion Causes GRC Component Cracking? — An In-Depth Analysis of Rust Expansion Effects and Prevention Technologies

2026-01-15 13:16:36

Click:

Cracking of GRC components caused by steel reinforcement corrosion is a typical durability problem, with its mechanism rooted in the internal stress generated by the volume expansion of corrosion products. Based on accelerated testing and verification in actual projects, Qinglong Group has determined that the volume of corrosion products is 2-4 times that of the original steel, and the resulting expansion stress can reach more than 30MPa—far exceeding the tensile strength of GRC (3-5MPa)—causing the protective cover to crack. Through strict anti-rust measures, this risk can be reduced to a minimum.

The corrosion process is divided into three stages: in the early stage, corrosion products fill the pores of the protective cover with no noticeable stress; in the middle stage, corrosion products accumulate and generate radial tensile stress; in the later stage, the protective cover cracks and corrosion accelerates. Tracking data from Qinglong Group's coastal projects show that corrosion begins when chloride ions penetrate to the steel surface and their concentration reaches a critical value (0.05%-0.1%). Insufficient cover thickness (<15mm) significantly shortens the time to cracking. In Hainan's high-temperature, high-humidity environment, components with a 20mm cover have a predicted time to cracking of up to 30 years, while 15mm components may develop cracks within 15 years.

Prevention and control measures are systematic. Increasing the density of the protective cover achieves a chloride diffusion coefficient ≤2.0×10⁻¹²m²/s. Qinglong Group significantly improves impermeability by incorporating active admixtures such as silica fume. Epoxy-coated or galvanized steel reinforcement is adopted to extend the corrosion induction period. Regular inspections are carried out, and rust stains are treated promptly when found. These measures effectively safeguard the long-term safety of components.

0
What Is the Mechanism by Which Steel Corrosion Causes GRC Component Cracking? — An In-Depth Analysis of Rust Expansion Effects and Prevention Technologies
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.