Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

When Is the Best Time to Demold GRC Components? — Research on Demolding Strength and Timing Control Technology

2026-01-15 13:13:30

Click:

The selection of demolding timing for GRC components directly affects component quality and production efficiency, and must be comprehensively determined through strength monitoring, environmental assessment, and process optimization. Based on 28 years of production data, Qinglong Group holds that quality GRC components should reach a demolding strength of 15MPa or above, with demolding typically occurring 16-24 hours after casting. Through scientific timing control, the demolding damage rate has been reduced to below 0.2%.

Strength development is the foundation of demolding decisions. On-site testing with a penetration resistance apparatus or rebound hammer ensures that strength meets requirements. In the Shenzhen Yirui Biotechnology Building project, Qinglong Group controlled demolding strength within the 15-20MPa range through real-time monitoring, ensuring component integrity while improving mold turnover rates. Temperature affects strength development: under the standard 20℃ environment, components can be demolded after 24 hours; at low temperatures, the time should be extended appropriately—48 hours is required at 10℃. Steam curing can shorten demolding time to 8-12 hours, but heating and cooling rates must be controlled to avoid thermal stress cracks.

Component type affects demolding timing. Flat components develop strength uniformly and can be demolded relatively early. Special-shaped and thin-walled components require caution to prevent deformation caused by insufficient strength. In the production of complex-shaped components for the Wuhan Hanxiu Theater, Qinglong Group determined the optimal demolding timing through finite element analysis, ensuring precise component geometry. Mold design also affects demolding: a reasonable draft angle (≥3°) and a smooth mold surface facilitate smooth demolding.

Proper demolding procedures are essential. Remove the side molds first, then the bottom mold, with steady movements and no impact. Qinglong Group trains professional demolding workers who must hold certification to ensure standardized operations. Scientifically determining demolding timing delivers a win-win of quality and efficiency.

0
When Is the Best Time to Demold GRC Components? — Research on Demolding Strength and Timing Control Technology
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.