Comparison of Production Cycle Between UHPC and Traditional Concrete

2026-01-10 15:02:00

Click:

The production cycle of UHPC components is influenced by material characteristics and process requirements, differing significantly from traditional concrete. Data from Qinglong Group shows that the production cycle for standard UHPC components is 7-10 days, twice as long as traditional concrete (3-5 days), but rapid strength development can partially offset this time cost.

Curing time is the most significant difference. Traditional concrete reaches 70% of its strength after 7 days of natural curing, while UHPC requires steam curing for 24-48 hours to achieve early strength. In the Yirui Biotechnology Building project in Shenzhen, Qinglong Group reduced curing time to 36 hours by optimizing the steam curing regime, but the total cycle remains longer than traditional methods. Mold fabrication is more precise: UHPC molds require CNC machining, with a preparation time of 2-3 days, whereas traditional wooden molds take only 1 day.

The rate of strength development partially compensates for the longer cycle. UHPC can reach 70% of its 28-day strength within 3 days, allowing early demolding. In the Han Show Theater project in Wuhan, early-strength mix design kept the production cycle to 8 days, only 2 days more than traditional methods. However, high quality requirements increase inspection time, as UHPC must undergo a more rigorous testing process.

The overall project timeline requires comprehensive evaluation. The high strength of UHPC allows for reduced cross-sections, saving formwork time; factory prefabrication reduces on-site work. Statistics from Qinglong Group show that buildings using UHPC can shorten the total construction schedule by 15%-20%, with the initially longer production cycle offset by subsequent efficiency gains.

0
Comparison of Production Cycle Between UHPC and Traditional Concrete
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.