The production lead time of customized GRC decorative panels is affected by multiple factors such as shape complexity, order quantity, and process requirements. Based on 28 years of production experience, Qinglong Group divides customized panel production lead times into three grades: 15-20 days for standard panels, 25-30 days for shaped panels, and 35-45 days for complex shaped panels.
Mold making is the primary factor affecting the lead time. Standard panel molds take 3-5 days to make, while shaped panel molds may take 7-10 days. In the double-curved panel project for the Guangxi New Media Center, Qinglong Group adopted five-axis CNC machined molds, keeping the production lead time of 200 sets of shaped molds within 15 days. For particularly complex relief panels, 3D scanning and rapid prototyping technologies are used to further shorten mold preparation time.
Process complexity determines the production duration. Flat panel products have a curing period of 7 days, while double-curved panels require segmented curing, extending the period to 10-12 days. In the perforated panel project for a hotel in Algeria, Qinglong Group controlled the curing time of 50mm thick panels to 14 days by optimizing the curing regime, 30% shorter than the standard process.
Order size affects the overall schedule. Small-batch orders (below 100㎡) have relatively longer lead times due to mold cost allocation; large-batch orders can improve efficiency through assembly line operations. Qinglong Group recommends that customers place orders 45 days in advance to ensure sufficient time for technical preparation and production arrangements.