How to Avoid Rapid Moisture Evaporation from GRC Exterior Walls in High-Temperature Regions? Qinglong's Technical Guide to GRC Construction in High Temperatures

2026-01-03 17:49:24

Click:

GRC exterior wall construction in high-temperature regions requires comprehensive measures to control moisture evaporation: keep the construction temperature between 5-35℃, and take shading measures when it exceeds 30℃; cover the surface with water-retaining film (PE film thickness ≥0.1mm); use retarding water-reducing agents to extend setting time; and spray curing agents to form a water-retaining film. These measures can reduce the moisture evaporation rate by more than 50%.

In a project in Dubai, where summer temperatures reached over 45℃, construction was successfully completed through the following measures: working during the cooler early morning and evening hours; using a specialized curing agent (water retention rate ≥90%); and setting up movable shading canopies. Post-construction testing showed that GRC strength developed normally, with no shrinkage cracks.

Selecting Construction Time

When the daily maximum temperature exceeds 30℃, schedule construction before 10 a.m. or after 4 p.m. Avoid the hot midday period, and stop construction when the temperature exceeds 35℃.

Configuring Water-Retention Measures

Immediately after construction, cover with PE film with an overlap width ≥100mm. Apply curing agent at 150-200g/㎡ to form a continuous film. Install shading nets to reduce the surface temperature by 5-8℃.

Adjusting the Material Mix

Use retarding water-reducing agents to extend the initial setting time to 3-4 hours. Add water-retaining components to raise the mortar water retention rate to ≥90%. Appropriately increase the amount of cementitious materials to improve crack resistance.

Optimizing the Curing Regime

Use intermittent spray curing, spraying water for 5 minutes every 2 hours. Use wet curing blankets to keep the surface continuously moist. Extend the curing period to more than 14 days.

High-temperature construction requires a systematic approach. Through comprehensive technical measures, the construction quality of GRC exterior walls in high-temperature regions can be assured.

0
How to Avoid Rapid Moisture Evaporation from GRC Exterior Walls in High-Temperature Regions? Qinglong's Technical Guide to GRC Construction in High Temperatures
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.