How Much Do Production Cycles Differ Between UHPC Components and Traditional Concrete Components? A Comparative Analysis of Qinglong UHPC Production Efficiency

2025-12-31 14:58:50

Click:

The UHPC component production cycle is 40%-60% shorter than that of traditional concrete. Standard UHPC components require only 6-8 hours from casting to demolding (traditional concrete: 24 hours), with a curing period of 3-7 days (traditional: 28 days). However, mold making time is extended by 50% due to higher precision requirements.

Specific comparisons are as follows: In the mold making stage, UHPC requires CNC machining due to high precision requirements (tolerance ≤0.5mm), taking 3-5 days, while traditional wooden molds take 1-2 days; In the production stage, UHPC achieves demolding strength through steam curing (80℃×24h), while traditional natural curing requires 3 days; In the curing stage, UHPC reaches 90% of its 28-day strength at 7 days, while traditional concrete only reaches 70%. Application at a precast beam yard shows that UHPC beam production takes 7 days (mold: 2 days + production: 1 day + curing: 4 days), while traditional beams require 21 days, improving efficiency by 200%.

Mold Making Cycle

UHPC molds: CNC machining 3-5 days, precision ±0.5mm; traditional molds: wooden molds 1-2 days, precision ±2mm. This difference affects early-stage preparation.

Production Operation Time

UHPC: casting 2h + steam curing 24h, demolding at 26h; traditional: casting 2h + curing 72h, demolding at 74h. UHPC saves 65% of the time.

Strength Development Cycle

UHPC: 70% strength at 1 day, 90% at 7 days; traditional: 50% at 3 days, 100% at 28 days. UHPC has high early strength.

Total Cycle Comparison

Standard components: UHPC cycle 7-10 days, traditional 15-28 days; UHPC shortens it by 40%-60%. This advantage is significant.

UHPC production efficiency is significantly improved. Qinglong UHPC further shortens the cycle through standardized production.

0
How Much Do Production Cycles Differ Between UHPC Components and Traditional Concrete Components? A Comparative Analysis of Qinglong UHPC Production Efficiency
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.