Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Risks Need Key Control in Mass UHPC Construction? Qinglong UHPC Mass Construction Control Technology

2025-12-31 14:55:49

Click:

Mass UHPC construction requires focused control of three types of risks: thermal cracks, shrinkage cracks, and structural cracks. Qinglong UHPC, through a temperature monitoring system, a cooling pipe network, and shrinkage-compensating technology, keeps the temperature difference between the core and the surface within 20°C, with crack width ≤0.1mm.

In a large foundation slab pour (volume 1200m³), the following control measures were adopted: pre-cooling of raw materials (cement <60°C, water <10°C); embedded cooling pipes (spacing 1.2m) with circulating water for cooling; addition of a retarder (initial setting extended to 6h) and an expansive agent (restricted expansion rate 0.02%); insulated curing (surface covering, temperature difference ≤20°C). Under monitoring by 128 temperature sensors, the maximum core temperature was 68°C, the temperature difference 17°C, and no visible cracks were found on inspection after 28 days.

Thermal Crack Control

Placement temperature controlled at ≤28°C; embedded cooling pipes (spacing 1-1.5m) with circulating water cooling; temperature monitoring system installed (measurement points spaced 3m apart). These measures control temperature rise.

Shrinkage Crack Prevention

Addition of expansive agent (restricted expansion rate 0.02%-0.03%); post-cast strips installed (spacing 20-30m); enhanced insulation and moisture curing. These measures reduce shrinkage.

Structural Crack Prevention

Optimized reinforcement (reinforcement ratio ≥0.8%); stress relief holes installed; layered casting (layer thickness ≤0.5m). These measures release stress.

Curing Regime Optimization

Insulated curing (surface covering, temperature difference ≤20°C); moisture curing (humidity ≥95%, duration ≥14d); these measures ensure quality.

Mass construction demands precise control. Qinglong UHPC has proven experience to ensure project quality.

0
What Risks Need Key Control in Mass UHPC Construction? Qinglong UHPC Mass Construction Control Technology
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.