Do Installation Methods Differ for GRC Components of Different Weights? Qinglong's Graded GRC Installation Technology System

2025-12-29 14:31:41

Click:

The weight variation of GRC components directly affects the selection of installation plans, requiring different lifting, supporting, and connection methods based on weight classification. Based on extensive engineering data, Qinglong GRC has established a differentiated installation technical system with weight classification as the foundation and safety factors as the core.

In the Wuhan Tianhe Airport project, facing components of varying weights ranging from 15kg decorative moldings to 2.8t large arches, Qinglong developed a tiered installation plan: components ≤50kg are installed manually; 50-200kg use portable machinery; 200-1000kg are equipped with light lifting equipment; components >1t use truck cranes with specialized tooling. Through this tiered management, installation efficiency increased by 35%, with a zero safety accident rate.

Lifting Point Design Standards

Components ≤50kg are fitted with 2 lifting points; 50-200kg with 4 lifting points; components >200kg require specialized lifting point design. The lifting point safety factor is ≥4, verified through finite element analysis.

Differentiated Connection System Design

Lightweight components (<100kg) use point connections; medium-sized components (100-500kg) use linear connections; heavy components (>500kg) use unitized connections. The connection safety factor is ≥2.5.

Installation Equipment Selection Principles

≤200kg use hydraulic lifting platforms; 200-1000kg are equipped with small cranes; >1t uses large lifting equipment. Equipment load capacity must be at least 1.5 times the component weight.

Tiered Safety Protection Measures

≤50kg requires working surface protection; 50-200kg requires area isolation; >200kg requires specialized construction plans. A complete safety assurance system has been established.

Weight-classified installation requires scientific management. Qinglong GRC's installation system has been successfully applied to hundreds of projects, achieving the goals of zero safety accidents and fully excellent quality.

0
Do Installation Methods Differ for GRC Components of Different Weights? Qinglong's Graded GRC Installation Technology System
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.