What Is the Key to Integrated Construction of GRC Curtain Walls and Insulation Systems? Qinglong GRC Insulation Integration Technology

2025-12-27 17:53:48

Click:

The key to integrated construction of GRC curtain walls and insulation systems lies in solving issues such as insulation fixing, thermal bridge treatment, and construction sequencing. Through system innovation, Qinglong GRC achieves a perfect combination of insulation and decoration.

In a commercial complex project in Shenyang, Qinglong GRC adopted a built-in insulation board system: 100mm thick rock wool boards were fixed with dedicated connectors, with a thermal conductivity of ≤0.040W/(m·K). The system's heat transfer coefficient is ≤0.45W/(m²·K), meeting the 75% energy-saving requirement. After three winters, the interior surfaces of the project showed no condensation, demonstrating significant insulation performance.

Key Points of Insulation Fixing Technology

Stainless steel thermal-break anchor bolts are used with an anchoring depth of ≥50mm; anchor bolt spacing is ≤300mm, arranged in a staggered pattern; insulation boards are tightly joined and laid with staggered joints. Reliable fixing is the foundation of system safety.

Key Techniques for Thermal Bridge Treatment

Connectors use nylon 66 thermal insulation gaskets with a thermal conductivity of ≤0.3W/(m·K); insulation strips are installed at board joints, continuous and complete; penetration points are sealed with foam sealant. Thorough thermal bridge treatment ensures energy-saving performance.

Key Points of Construction Sequence Coordination

Install the insulation layer first, then install the GRC panels; construct in layers with fire stopping at each level; carry out sealing work promptly to prevent rainwater intrusion. Proper sequencing avoids potential quality issues.

System Performance Assurance Measures

Conduct wind pressure resistance testing (≥5kPa), thermal performance testing, and fire resistance testing (≥1h); set up inspection openings for convenient later maintenance; perform regular infrared thermal imaging inspections. System testing ensures performance.

Integrated construction requires systematic design. It is recommended to select an experienced manufacturer and carry out necessary testing. Qinglong GRC provides comprehensive integrated solutions to ensure system performance.

0
What Is the Key to Integrated Construction of GRC Curtain Walls and Insulation Systems? Qinglong GRC Insulation Integration Technology
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.