Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How Does Large-Area GRC Curtain Wall Solve Thermal Stress Problems? Qinglong GRC Thermal Deformation Control Technology

2025-12-27 17:47:46

Click:

Temperature stress control of large-area GRC curtain walls is a design key, requiring rational joint design, connection detailing, and material selection to accommodate thermal deformation. Based on thermal calculations and engineering practice, Qinglong GRC has developed a scientific temperature stress control system.

In a cultural center project in Xinjiang (curtain wall area of 38,000 ㎡, annual temperature difference of 70℃), Qinglong GRC controlled the curtain wall panel dimensions to 1.2m×3.6m through precise calculation, set expansion joint spacing at ≤15m with a joint width of 20mm. The connection system features a slotted hole design allowing ±10mm of thermal movement. Over three years of measurement, the maximum thermal deformation was 8mm, fully within the system's allowable range, with no cracking whatsoever.

Joint Design Principles

Panel dimensions are calculated based on the amount of thermal deformation, generally ≤1.5m×4m; expansion joint spacing ≤15m, with joint width calculated as ΔL=α·L·ΔT plus a safety factor; joints are filled with elastic sealant with movement capability ≥25%. This design effectively releases thermal stress.

Connection Detailing Measures

Hangers adopt a slotted hole design allowing horizontal movement ≥10mm; sliding shims are provided with a friction coefficient ≤0.1; an elastic cushion layer is placed between connectors and the structure to avoid rigid contact. These details accommodate thermal deformation.

Material Thermal Performance Control

Control the GRC coefficient of linear expansion at ≤1.0×10⁻⁵/℃; select sealant with a moderate elastic modulus; increase fiber content to control drying shrinkage cracks. Material performance is the fundamental safeguard.

Construction Timing Control

Avoid installation during high-temperature periods and choose seasons with relatively stable temperatures; measure the actual temperature during installation and reserve appropriate deformation allowance; set initial positions strictly according to the design temperature. These controls reduce construction errors.

Thermal stress requires systematic control. Detailed thermal calculations and the installation of necessary monitoring points are recommended. Qinglong GRC provides professional thermal stress solutions to ensure the long-term safety of curtain walls.

0
How Does Large-Area GRC Curtain Wall Solve Thermal Stress Problems? Qinglong GRC Thermal Deformation Control Technology
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.