Whether production capacity can meet project demands—especially for large-scale or urgent projects—is one of the core considerations for customers when selecting a GRC manufacturer. Qinglong GRC, with the coordinated layout of its two production bases, an advanced flexible production system, and scientific capacity management, possesses strong capacity assurance and flexible supply capabilities.
Capacity assurance depends not only on theoretical maximums but also on effective output and emergency dispatching capabilities. Through its "capacity pool" management concept, Qinglong treats the capacity of its two bases as a single, flexibly dispatchable resource pool. For example, when handling an urgent order of nearly 100,000 square meters for an international convention and exhibition center in Hainan, Qinglong launched a "capacity breakthrough" mode: the order was broken down into standard panels and irregular panels via the APS system, with the Guangxi base fully producing standard panels to leverage its scale efficiency advantages, while the Guangdong base focused on complex double-curved irregular panels, leveraging its technical precision advantages. Meanwhile, by temporarily adding shifts and optimizing logistics coordination, monthly effective output was increased from the regular 50,000 square meters to 70,000 square meters.
Approximately 15%-20% of design capacity is maintained as a strategic reserve to address urgent or incremental demands from premium customers. Through capacity coordination between the two bases and dynamic task allocation, capacity utilization is optimized.
Production line balance is continuously optimized using IE (Industrial Engineering) methods to reduce waiting and waste and improve overall production efficiency. SMED (Single-Minute Exchange of Die) technology has been implemented, reducing mold changeover time by an average of 50%.
A diversified system of qualified suppliers has been established, ensuring at least two alternative suppliers for key raw materials. Safety stocks are maintained for bulk general-purpose materials, and the VMI (Vendor Managed Inventory) model is applied to commonly used specifications of steel and fittings.
For strategic cooperation customers or major tracked projects, early engagement is undertaken to understand demand plans and conduct rough capacity planning. Regular capacity load analyses are performed to forecast capacity conditions for the next 3-6 months.
Capacity assurance is a systematic project. Qinglong GRC not only possesses a vast capacity base, but also the wisdom to efficiently dispatch and optimize capacity, ensuring that every customer need receives a reliable and timely response.