What Are the Steps for GRC Installation? Qinglong's Standardized GRC Installation Process Explained

2025-12-22 17:22:38

Click:

GRC installation must follow a standardized process, generally divided into six stages: preparation, measurement and layout, substrate treatment, panel installation, joint treatment, and cleaning and acceptance. Each stage has strict technical requirements.

In the Shanghai Century Plaza renovation project, the Qinglong installation team strictly followed the standardized process: first, an on-site survey was conducted, using a 3D scanner to obtain substrate data; then BIM models were used for installation simulation to optimize the installation sequence; installation proceeded from bottom to top, center first then sides, completing a fixed area each day; joint treatment used specialized sealant applied in two passes; finally, comprehensive inspection and acceptance were carried out. This standardized operation ensured the project was completed with high quality.

Pre-Installation Preparation Stage

Verify drawings against on-site dimensions; adjust if errors exceed tolerance. Check panel numbering, quantity, and quality; replace damaged panels. Prepare construction tools and check safety devices. Conduct technical briefings to clarify key points.

Measurement and Layout Stage

Set installation datum lines with accuracy of ±1mm. Snap panel grid lines clearly and accurately. Recheck substrate dimensions and record deviation data. Layout lines must be verified and confirmed after completion.

Substrate Treatment Requirements

Substrate strength must meet standards, free of hollowing and cracking. Flatness deviation ≤4mm/2m. Waterproofing layer intact, free of leaks. Embedded parts accurately positioned, firm and reliable.

Panel Installation Techniques

Install panels in numbered sequence to prevent mix-ups. Fix hangers securely and adjust into position. Keep panel joints even and consistent in width. Inspect and correct promptly to ensure quality.

Strict adherence to the standard process guarantees installation quality. Qinglong GRC's standardized installation system ensures every project is presented perfectly.

0
What Are the Steps for GRC Installation? Qinglong's Standardized GRC Installation Process Explained
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.