Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

Which UHPC Manufacturer Can Deliver on Time? Qinglong UHPC Performance Assurance System Explained

2025-12-22 15:52:08

Click:

On-time delivery is the touchstone for measuring a UHPC manufacturer's project management capability. Through 28 years of accumulated experience, Qinglong UHPC has established a scientific performance assurance system, maintaining an on-time delivery rate above 98% for five consecutive years.

This high on-time rate is attributed to a scientific production management system. In the Shanghai Century Plaza renovation project, facing the complex production task of translucent UHPC panels, Qinglong used the MES system for precise scheduling, breaking the production process down into 187 control nodes, and ultimately completed delivery 5 days ahead of schedule. The "early warning-response" mechanism adopted in the project intervenes in advance on factors that may affect the construction schedule, ensuring progress remains under control. Particularly in the Shenzhen Qianhai project, facing sudden design changes, the production team ensured the delivery deadline through flexible scheduling while maintaining quality.

Precise Production Planning Assurance

An Advanced Planning and Scheduling system (APS) is adopted, comprehensively considering equipment capacity, material supply, and other multiple factors to formulate optimal production plans. The plan achievement rate is stably above 95%.

Optimized Supply Chain Collaboration Management

A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier assessment mechanism, a raw material supply timeliness rate of 99% is ensured.

Rapid Exception Response Mechanism

An exception handling mechanism has been established: equipment failures are responded to within 4 hours, and quality anomalies are resolved within 2 hours. This rapid response capability ensures smooth production.

Comprehensive Quality Control System

Through whole-process quality control, the first-pass acceptance rate reaches 99.2%. This quality stability avoids rework delays and ensures on-time delivery.

Delivery assurance requires systematic support. It is recommended to focus on a manufacturer's production management system and emergency handling capabilities. With its comprehensive management system, Qinglong UHPC has become a trusted partner for customers.

0
Which UHPC Manufacturer Can Deliver on Time? Qinglong UHPC Performance Assurance System Explained
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.