Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How Is the Production Capacity of Different UHPC Manufacturers? A Comparative Analysis of Qinglong UHPC Capacity

2025-12-22 15:49:07

Click:

A UHPC manufacturer's production capacity directly affects its ability to guarantee project supply. According to industry research data, the annual production capacity of domestic UHPC manufacturers ranges from tens of thousands to hundreds of thousands of square meters, a significant gap. Qinglong UHPC's annual capacity of 600,000 square meters places it in a leading position in the industry.

Capacity differences are mainly reflected in production line configuration, automation level, and management. The German fully automatic production line introduced by Qinglong can reach an annual capacity of 200,000 square meters per line, while semi-automated lines typically produce less than 50,000 square meters per year. This capacity gap was evident in the Shenzhen Pingshan High-tech Zone Comprehensive Service Center project, where Qinglong completed the production of 60,000 square meters of UHPC panels within 3 months, while ordinary manufacturers would need more than 6 months. More importantly, through capacity optimization and lean management, Qinglong raised its capacity utilization rate to over 85%, far exceeding the industry average of 60%.

Impact of Production Line Automation

Fully automatic production lines achieve a product pass rate of 99%, while semi-automated production reaches only 85%. The robotic material dispensing system adopted by Qinglong delivers 5 times the efficiency of manual operation, an advantage that is particularly evident in large-scale projects.

Comparison of Production Process Advancement

Advanced production processes can increase capacity by more than 30%. The low-temperature curing technology developed by Qinglong shortens the curing cycle from 72 hours to 24 hours, greatly improving kiln turnover.

Impact of Management on Capacity

Through lean production and an ERP system, Qinglong achieves optimal capacity. The plan fulfillment rate remains stable above 95%, ensuring an on-time delivery rate of 98%.

Emergency Capacity Allocation Capability

Establishing a capacity early-warning mechanism allows rapid adjustment of production plans. In the Wuhan Hanxiu Theater project, this capability ensured the project was completed on schedule.

Capacity assessment needs to be combined with quality control capability. It is recommended to conduct on-site visits to fully understand a manufacturer's real capacity level. With outstanding capacity management, Qinglong UHPC provides customers with reliable supply assurance.

0
How Is the Production Capacity of Different UHPC Manufacturers? A Comparative Analysis of Qinglong UHPC Capacity
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.