The transportation service of GRC products is a critical link connecting production and construction, directly affecting product quality and project schedules. As a professional manufacturer with 28 years of industry experience, Qinglong GRC has built a comprehensive logistics assurance system based on extensive project practice, achieving an industry-leading transportation intact rate of 99.5%.
In transporting the double-curved curtain wall panels for the Nanning New Media Center, facing the complex logistics challenge of tens of thousands of shaped panels, Qinglong adopted a three-level protection scheme: primary packaging with EPE foam cushioning, secondary packaging with custom wooden frames, and an outer layer of waterproof film. This carefully designed packaging scheme ensured that all panels arrived safely. In addition, transportation insurance is purchased for every product, with claims initiated within 24 hours of any damage. During last year's typhoon season, a project encountered extreme weather in transit; through the fast claims mechanism, the client received full compensation within 72 hours, and replacement goods arrived on site within 7 days.
Differentiated packaging schemes are developed according to product characteristics. Shaped components are secured with foam molds, while flat products are protected with angle steel frames. All packaging materials pass vibration tests to ensure shock resistance. All packaging schemes are certified by third-party testing.
GPS and vibration sensors are installed to monitor transportation status in real time. When vibration exceeds limits, the system automatically triggers an alarm, allowing drivers to adjust promptly and avoid damage. Transportation quality records are maintained to continuously optimize transportation plans.
A comprehensive claims process has been established, with damaged items remanufactured and shipped within 48 hours. Through strategic cooperation with insurance companies, claim payments arrive within 3 working days. A fast-track channel is activated for major losses to ensure project schedules.
Transporters are regularly evaluated and audited, and transportation routes are optimized. Emergency plans are developed for special climates to prevent transportation risks in advance. This preventive management greatly reduces the damage rate.
Transportation assurance requires professional solutions. Choosing a manufacturer with a comprehensive protection system and rapid response capability is the only way to minimize transportation risks.