What Should Be Paid Attention to in UHPC Construction? Key Construction Control Points of Qinglong UHPC

2025-12-19 14:03:32

Click:

UHPC construction quality directly determines the final performance, and every step must be strictly controlled. Qinglong UHPC has summarized 28 key control points to ensure construction quality.

During the material preparation stage, the raw material temperature must be controlled at 20±2℃; temperatures that are too high or too low will affect workability. Before mixing, the aggregate moisture content must be accurately measured and the water amount adjusted accordingly. In a major project in Wuhan, neglecting changes in aggregate moisture content caused one batch of UHPC to fail workability standards, resulting in a direct scrapping loss of 200,000 yuan. During pouring, the placing speed must be controlled at 0.5–1.0 m/h, with layer thickness not exceeding 300 mm. Especially during the curing stage, formwork removal time must be determined according to strength development; removing formwork too early will cause surface damage.

Temperature Control Requirements

Raw material temperature, ambient temperature, and mold temperature all need to be monitored. Summer construction requires cooling measures, while winter requires insulated curing. Excessive temperature deviation can easily lead to quality problems.

Time Control Precision

Mixing time, transport time, and pouring time all need to be precisely controlled. From mixing to the completion of pouring must be within 90 minutes; exceeding this time requires scrapping.

Process Discipline Enforcement

Feed materials strictly according to the mix ratio and operate according to the process. Each procedure must be checked and confirmed upon completion before proceeding to the next. This discipline is the guarantee of quality.

On-site Monitoring Requirements

Prepare test specimens at the prescribed frequency to monitor strength development. Monitor slump changes during pouring. Monitor temperature changes during the curing period.

Strictly enforcing process discipline is the key to success. Qinglong UHPC provides on-site technical guidance to ensure every step is under control.

0
What Should Be Paid Attention to in UHPC Construction? Key Construction Control Points of Qinglong UHPC
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.