Is UHPC Construction Difficult? Qinglong UHPC Professional Construction Technology Analysis

2025-12-19 14:00:31

Click:

UHPC construction indeed demands more than ordinary concrete, but these difficulties can be fully overcome through professional training and standardized operations. Based on 28 years of construction experience, Qinglong UHPC has developed a scientific construction system.

In terms of construction techniques, UHPC requires precise mix proportion control and strict process discipline. The water-binder ratio error must be controlled within ±0.2%, and mixing time must be accurate to the second. In a major project in Shenzhen, Qinglong used an automated mixing plant with a proportioning accuracy of 0.1%, ensuring consistent performance of every batch of material. Specialized equipment must be used during pouring, with vibration time controlled at 20-30 seconds; excessive vibration causes fibers to sink. Curing is even more critical, requiring the heating and cooling rate to be kept within 15℃/h and the relative humidity at ≥95%.

Precision Requirements for Mix Proportion Control

UHPC imposes extremely high requirements on raw material metering accuracy: the weighing error of cementitious materials such as cement and silica fume must be ≤0.5%, and that of water reducers ≤0.1%. Such precision requires specialized equipment.

Unique Mixing Process

A forced-action mixer is used, with a mixing time 50% longer than that of ordinary concrete. The feeding sequence is strictly specified: fibers must be added in stages to ensure uniform dispersion.

Professional Pouring Operations

Pumping must be used for pouring to avoid segregation. Vibration time is strictly controlled, as excessive vibration affects fiber distribution. The construction temperature must be between 5-35℃.

Strict Curing Regime

Steam curing is adopted, with a heating rate ≤15℃/h and constant-temperature curing lasting 24-48 hours. The cooling rate is ≤20℃/h to prevent thermal cracking.

Through professional training and technical briefings, construction difficulties can be fully controlled. Qinglong UHPC provides full-process technical guidance to ensure construction quality.

0
Is UHPC Construction Difficult? Qinglong UHPC Professional Construction Technology Analysis
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.