Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

كم تبلغ مدة التسليم المعتادة لمصنعي GRC؟ تحليل المهلة ونظام التسليم الفعال لمجموعة تشينغلونغ

2026-01-28 15:42:18

تصفح:

The delivery time of a GRC manufacturer is not a fixed value, but a dynamic process formed by the overlap of five stages—"design cycle, mold making, production scheduling, curing time, and logistics and transportation"—usually ranging between 30 and 90 days. Based on standardized production processes and a project database, Qinglong Group manages delivery times in tiers: for standard flat panels with existing molds (e.g., 3000×1200mm), the delivery time can be shortened to 15-20 days; for conventional shaped components requiring new molds, the cycle is 30-45 days; for complex double-curved, perforated, or oversized special-shaped components, 60-90 days are required. In the Shenzhen Pingshan High-tech Zone Comprehensive Service Center project, through early BIM detailing, parallel mold making, and rolling production scheduling, we compressed the delivery time from the original 75 days to 50 days, safeguarding the project's key milestones. Scientific management is the core of shortening delivery time.

Analysis of the Key Stages Affecting Delivery Time

Design detailing and confirmation: this stage is prone to delays caused by repeated communication. We use a BIM collaboration platform to confirm details online with clients and designers, reducing the average confirmation time from 2 weeks to 5 working days. Mold making: this is a rigid time bottleneck. Through three-shift operations at CNC machining centers, we keep the steel mold making cycle within 15-25 days. Production and curing: the standard curing cycle takes 7-14 days. We use a steam curing process to shorten the time to reach target strength to 3 days.

Qinglong Group's Systematic Measures to Shorten Delivery Time

We have established a "standard component library" covering 80% of commonly used panel types, which can be called upon for production at any time. We promote "modular design" to convert non-standard parts into combinations of standard modules, reducing the number of molds. We implement a "rolling production plan" that combines similar components from multiple projects for joint production, improving efficiency. In the Nanning New Media Center project, modular design reduced the number of molds by 40% and shortened the delivery time by 30%.

Transparent Progress Management Builds Client Confidence

Through a project collaboration system, we share real-time progress of the design, mold, production, and logistics stages with clients, and any delay risk is flagged with an advance warning. Clients can check their order status at any time, just like tracking an express delivery. This transparency eliminates uncertainty and makes it easier for clients to arrange subsequent processes.

Therefore, a reasonable delivery time is a reflection of a manufacturer's overall capabilities. Through process optimization and technological innovation, Qinglong Group continuously improves delivery efficiency while ensuring quality, becoming a reliable guarantee for clients' project schedules.

0
كم تبلغ مدة التسليم المعتادة لمصنعي GRC؟ تحليل المهلة ونظام التسليم الفعال لمجموعة تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.