Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

ما تطبيقات تقنية BIM على مدار العملية في مشاريع هندسة GRC؟ البناء الرشيق المدفوع رقمياً

2026-01-22 14:24:48

تصفح:

BIM (Building Information Modeling) technology has been deeply integrated into the full lifecycle of modern GRC engineering projects, playing an irreplaceable role from early design schemes to later operation and maintenance. Qinglong Group, as a pioneer in digitalization practices within the industry, summarizes the application of BIM technology in GRC projects into the following five core stages.

1. Scheme Design and Detailed Development Stage: At this stage, BIM serves as the "translator of design" and the "detector of problems". We receive the architect's creative models (often free-form surfaces created in software such as Rhino) and import them into BIM platforms such as Revit for detailed development. The work includes: performing rationalization analysis of complex curved surfaces and optimizing panel grid dimensions to ensure components can be produced and installed; conducting structural load analysis to determine panel thickness, stiffening ribs, and embedment positions; and carrying out clash detection with other disciplines such as MEP and lighting to resolve pipeline conflicts and reserve installation space in advance.

2. Mold Design and Production Stage: BIM is the "commander of manufacturing". The geometric information of the fully developed GRC component BIM models can be directly exported as machining code for CNC machine tools, driving equipment to precisely manufacture molds—achieving "model as mold" with errors controlled at the millimeter level. Meanwhile, information in the model (such as component ID, volume, and weight) can automatically generate a Bill of Materials (BOM) to guide production planning and material procurement.

3. Construction Simulation and Schedule Management Stage: BIM is the "rehearsal stage of construction". Using 4D BIM (model + time), the installation sequence and hoisting paths of the entire GRC curtain wall can be simulated to optimize construction plans and identify conflicts in installation procedures in advance. For the Hainan Convention and Exhibition Center project, we optimized the installation workflow through construction simulation, improved the utilization efficiency of large hoisting equipment, and shortened the construction period.

4. On-site Installation and Quality Control Stage: BIM is the "navigator on site". BIM models are imported into total stations, layout robots, or tablets to guide precise on-site setting-out and installation positioning. Installation personnel can view the 3D model in real time to clearly identify the position and number of each panel. Installation data (such as deviation measurements) can be fed back into the model, enabling visual traceability of quality.

5. Operation & Maintenance and Asset Management Stage: BIM is the "medical record of the building". The as-built BIM model is delivered to the owner, integrating the production information, installation information, and maintenance records of each GRC component. When inspection, cleaning, repair, or replacement is needed in the future, components can be quickly located and relevant information retrieved, achieving refined, information-based facility management.

0
ما تطبيقات تقنية BIM على مدار العملية في مشاريع هندسة GRC؟ البناء الرشيق المدفوع رقمياً
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.