Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

هل تختلف طرق التركيب لمكونات GRC بأوزان مختلفة؟ خطط الرفع والبناء المتمايز لمجموعة تشينغلونغ

2026-01-20 16:38:06

تصفح:

GRC components of different weights require differentiated installation designs. Lightweight panels (≤100kg) can be installed manually, while heavy panels (>300kg) require mechanical lifting. The key lies in the precise matching of lifting point design, lifting equipment, and safety measures. In the Hainan International Convention and Exhibition Center project, Qinglong Group customized vacuum suction cup lifting devices (suction force ≥200kg per point) and calculated lifting point positions (≥1/4 of panel length from the edge) for 120,000 square meters of roof panels (each weighing 150-500kg), achieving an installation efficiency of 500m² per day. Scientific installation methods ensure safety and precision while preventing component damage.

Lightweight Component Installation Optimization

Panels weighing ≤100kg are installed manually with simple lifting tools. Qinglong Group trains its installation workers, achieving high efficiency and low cost.

Mechanical Lifting of Heavy Components

Panels weighing >300kg are lifted using tower cranes or truck cranes. Lifting points are verified through finite element analysis, with a safety factor ≥3.

Safety and Precision Control

Operations stop when wind speed exceeds 10m/s, and installation error is ≤±3mm. Qinglong Group maintains a zero-accident safety record.

Differentiated installation enables efficient and safe construction.

0
هل تختلف طرق التركيب لمكونات GRC بأوزان مختلفة؟ خطط الرفع والبناء المتمايز لمجموعة تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.