Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

ما أفضل وقت لفك قوالب مكونات GRC؟ التحكم في فك القوالب ومعايير إدارة التوقيت لمجموعة تشينغلونغ

2026-01-20 16:19:30

تصفح:

Determining the demolding time for GRC components requires comprehensive consideration of three factors: strength development, environmental conditions, and component shape. Demolding too early causes deformation and cracking, while demolding too late affects efficiency. Based on 28 years of data accumulation, Qinglong Group has set standard demolding times: strength ≥15MPa under natural curing (typically 24-36 hours), and strength ≥20MPa under steam curing (2-4 hours after curing). For the complex-shaped components of the Wuhan Han Show Theater, real-time control via strength monitors kept demolding errors within ≤±1 hour, achieving a 99.8% component pass rate. Precise demolding is key to ensuring geometric accuracy and surface quality.

Strength Indicators Are the Core Basis

Side forms can be removed at a flexural strength ≥5MPa, and full demolding at ≥15MPa. Qinglong Group uses non-destructive testing instruments, achieving a 100% strength compliance rate.

Adjust Demolding Time Based on Ambient Temperature

At 20℃, the demolding time is 24 hours, extended by 6 hours for every 5℃ drop. In northern projects, heated curing is adopted to keep the schedule on track.

Differentiated Management by Component Shape

Thin panels (≤20mm) have their demolding time reduced by 20%, while special-shaped components are extended by 30%. BIM simulation is used to optimize the demolding sequence.

Qinglong Group's standardized demolding process improves both quality and efficiency.

0
ما أفضل وقت لفك قوالب مكونات GRC؟ التحكم في فك القوالب ومعايير إدارة التوقيت لمجموعة تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.