Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

كيف تنضج مكونات GRC بالبخار في البيئات منخفضة الحرارة؟ البناء الشتوي وعملية التحكم في درجة الحرارة لمجموعة تشينغلونغ

2026-01-20 15:33:00

تصفح:

Steam curing of GRC components in low-temperature environments must compensate for low-temperature effects through "preheating treatment + gradient temperature increase + extended insulation time" to ensure the hydration reaction proceeds fully. In projects in northern regions, for ambient temperatures of 0-10°C, Qinglong Group extended the curing cycle from the standard 24 hours to 36-48 hours: first preheating components to above 15°C, raising the temperature to 60°C at a rate of ≤10°C/h, extending the constant-temperature period to 28-32 hours, and lowering the temperature at a rate of ≤15°C/h. Through these adjustments, GRC can still achieve over 75% of its 28-day strength at low temperatures, avoiding freeze damage and strength loss. In a winter construction project in Shenyang, we produced high-quality GRC components meeting the 150MPa compressive strength target through precise temperature control.

Preheating Treatment Prevents Frost Damage

Before curing, components are moved to a preheating room (temperature ≥15°C) and left to stand for 12 hours to eliminate the risk of ice crystals. The steam curing kiln is preheated in advance to avoid condensation. Qinglong Group uses a hot air circulation system to ensure uniform temperature inside the kiln.

Gradient Temperature Increase Ensures Quality

The heating rate is reduced to 10°C/h and the constant-temperature stage is extended by 30% to promote the hydration reaction at low temperatures. The core temperature of components is monitored to prevent excessive temperature differences between inside and outside. Scientific curing overcomes low-temperature challenges.

0
كيف تنضج مكونات GRC بالبخار في البيئات منخفضة الحرارة؟ البناء الشتوي وعملية التحكم في درجة الحرارة لمجموعة تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.