Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

كيف تثبّت GRC بعد التركيب؟ تصميم نظام الاتصال ونظام ضمان السلامة لمجموعة تشينغلونغ

2026-01-19 14:49:36

تصفح:

The fixing method after GRC installation is a core element in ensuring curtain wall safety. Based on 28 years of engineering practice, Qinglong Group has developed a variety of connection systems, including under cut anchor, hook-on, and embedded part welding systems, each of which has undergone rigorous mechanical calculation and experimental verification. In Luban Award projects such as the Shenzhen Pingshan High-tech Zone Comprehensive Service Center, our connection systems withstood severe typhoons, demonstrating their outstanding reliability.

Undercut anchor connections are the first choice for large panels. They use stainless steel undercut anchors (Grade A4-80) with an anchoring depth of ≥15mm and a pull-out resistance of ≥5kN per anchor. In the Wuhan Han Show Theatre project, Qinglong Group conducted on-site pull-out tests on every anchor to ensure the anchoring force reached 1.5 times the design value. Hook-on systems are suitable for conventional panels, achieving three-dimensional adjustment through aluminum alloy hangers, with an adjustment range of up to ±20mm.

Special areas require special fixing solutions. For corner areas, we use reinforced steel frames rigidly connected to the main structure. In the wave-shaped roof project of the Hainan International Convention and Exhibition Center, we developed custom connectors to achieve precise fixing of curved panels. All connectors are hot-dip galvanized, providing corrosion protection for more than 25 years.

Quality control is the guarantee of fixing safety. Qinglong Group requires torque testing at every connection point, keeping bolt tightening torque deviations within ±5%. After installation, an endoscope is used to spot-check anchoring depth to ensure fixing reliability. Through this rigorous quality control system, we provide lifetime safety assurance for every project.

0
كيف تثبّت GRC بعد التركيب؟ تصميم نظام الاتصال ونظام ضمان السلامة لمجموعة تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.