Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

ما العوامل الواجب مراعاتها في خطة الرفع للأشكال فائقة الحجم من GRC؟ تصميم نظام السلامة لرفع وتركيب المكونات الثقيلة وفق تشينغلونغ

2026-01-16 15:05:06

تصفح:

The hoisting of super-large GRC shapes (single piece weight ≥5 tons or dimensions ≥6 meters) is a high-risk operation, requiring comprehensive evaluation of component strength, lifting point design, lifting equipment, and safety contingency plans. In the hoisting of large roof panels at the Hainan International Convention and Exhibition Center, Qinglong Group verified hoisting stresses through finite element analysis (≤50% of design stress), dedicated lifting fixtures (safety factor ≥4), and BIM simulation, achieving the safe installation of GRC panels weighing 8 tons per piece with an area of 20 square meters, with errors controlled within ±3mm.

Lifting point design is critical; positions and quantities are determined through calculation, with local reinforcement to avoid stress concentration. Lifting equipment selection must match component weight and site conditions, and multi-crane tandem lifting requires synchronized control. Safety measures include wind speed monitoring (lifting suspended when wind force exceeds level 6), trial hoisting verification, and emergency contingency plans. Through scientific management, Qinglong Group has achieved a zero accident rate in large-scale hoisting operations. Comprehensive plans ensure the smooth progress of major projects.

0
ما العوامل الواجب مراعاتها في خطة الرفع للأشكال فائقة الحجم من GRC؟ تصميم نظام السلامة لرفع وتركيب المكونات الثقيلة وفق تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.