Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

نقاط التصميم الرئيسية لصرف الأسطح لألواح GRC أحادية الانحناء وفق تشينغلونغ

2026-01-10 17:37:00

تصفح:

When single-curved GRC panels are used for roofing, the drainage design directly affects functionality and durability. Based on experience from multiple large-scale roofing projects, Qinglong Group has summarized three key design points—slope control, joint treatment, and drainage organization—to ensure smooth roof drainage without leakage.

Slope design is the foundation of drainage. The minimum slope for single-curved roof panels should be no less than 3%, increasing to 5% at critical areas. In the Hainan International Convention and Exhibition Center project, Qinglong Group used BIM models for drainage simulation and optimized panel surface curvature, keeping rainwater concentration time within 5 minutes. Guide grooves are set on the panel surface, 30-50mm wide and 10-15mm deep, to direct rainwater discharge in an orderly manner. For large-span roofs, a bidirectional slope design is adopted to avoid localized ponding.

Joint treatment is a critical step. Panel joint width is determined by thermal deformation calculations, typically 15-20mm. Qinglong Group adopts a "triple waterproofing" design: a base sealant layer (polysulfide type), a middle drainage cavity, and a surface weather-resistant sealant (silicone type). A project in Shenzhen once experienced leakage due to improper joint design; after optimization and improvement, joints were redesigned using the pressure-equalized cavity principle, effectively eliminating the leakage.

The drainage system requires a complete design. Rainwater outlet spacing should not exceed 15m, with outlet size calculated based on the catchment area. Qinglong Group installs overflow systems in critical roofing projects to ensure smooth drainage during rainstorms. With scientific drainage design, single-curved GRC roofs can remain leak-free under a once-in-a-century rainstorm, with a service life of over 50 years.

0
نقاط التصميم الرئيسية لصرف الأسطح لألواح GRC أحادية الانحناء وفق تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.