Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

كيف نمنع التبخر السريع للرطوبة من جدران GRC الخارجية في المناطق عالية الحرارة؟ تدابير المعالجة مع تشينغلونغ

2026-01-10 14:12:24

تصفح:

Controlling moisture evaporation in GRC exterior walls in high-temperature environments is key to ensuring material performance. From projects in tropical regions, Qinglong Group has summarized comprehensive measures in three areas—material optimization, construction control, and post-placement curing—effectively solving the problem of plastic shrinkage cracks caused by overly rapid moisture evaporation.

Material optimization is the foundation of evaporation control. Incorporating cellulose ether (0.1%-0.3%) or starch ether improves water retention, extending the initial setting time to 2-3 hours. In a hotel project in Algeria, Qinglong Group optimized the mix ratio to keep the moisture evaporation rate of the material below 0.5kg/m²h in a 45℃ environment. At the same time, retarding water reducers are used to delay the peak of cement hydration heat release and reduce thermal stress.

Construction process control directly affects the amount of evaporation. Avoid construction during the daily high-temperature period (11:00-15:00), and choose cooler times in the early morning or evening. During construction, Qinglong Group uses shading nets to reduce direct sunlight, lowering panel surface temperature by 10-15℃. Mist spraying maintains ambient relative humidity at ≥70%, effectively slowing surface moisture evaporation. For joint treatment, a dual seal of backer rod plus sealant is used to prevent moisture from escaping rapidly through the joints.

Curing measures are key to ensuring the hydration reaction. Immediately after demolding, spray a curing agent (film-forming type, applied at 150-200g/m²) to form a water-retaining film. Cover with plastic sheeting for curing for no less than 7 days, with an overlap width of ≥100mm. Qinglong Group's practice in high-temperature region projects shows that scientific curing increases the 28-day strength of GRC by more than 15%, effectively preventing drying shrinkage cracks.

0
كيف نمنع التبخر السريع للرطوبة من جدران GRC الخارجية في المناطق عالية الحرارة؟ تدابير المعالجة مع تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.