Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

كيف تُضبط الدعامات المؤقتة عند تركيب ألواح GRC؟ السلامة الإنشائية وضبط الدقة مع تشينغلونغ

2026-01-10 13:19:42

تصفح:

The temporary support system during GRC panel installation is a key element in ensuring construction safety and precision. Based on 28 years of installation experience, Qinglong Group believes that temporary supports must meet three major requirements—stability, adjustability, and safety. Support point spacing should generally not exceed one-third of the panel length, and the system should form a geometrically stable structure.

Support point layout requires scientific calculation. For standard panels (dimensions ≤3m), four-point support is adopted, with support points positioned 200-300mm from the panel edges. In the Shenzhen Yirui Biotechnology Building project, finite element analysis was used to optimize support positions, reducing installation stress by 30%. Large panels (>5m) require additional intermediate supports to avoid excessive deflection. The support system stiffness must meet requirements, with deflection under maximum load not exceeding L/500.

Adjustable devices are key to precision control. Qinglong Group uses threaded jacks as support heads, achieving an adjustment precision of ±1mm. In the installation of double-curved panels at the Wuhan Han Show Theater, a ball-hinge connection device was developed, allowing angular adjustment of ±5°. After the support system is in place, pre-loading tests must be performed to eliminate inelastic deformation.

Safety protection measures are indispensable. Temporary supports must have sufficient wind resistance, remaining stable even at wind speeds of 10m/s. Fall-prevention nets and warning signs should also be installed to ensure construction safety. Support removal must wait until permanent connections reach design strength, to avoid structural damage.

0
كيف تُضبط الدعامات المؤقتة عند تركيب ألواح GRC؟ السلامة الإنشائية وضبط الدقة مع تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.