Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

ما متطلبات تكرار المعالجة المائية لألواح GRC؟ نظام المعالجة وتطور القوة مع تشينغلونغ

2026-01-09 18:08:00

تصفح:

Water curing of GRC panels is a critical step in ensuring their strength development and durability, and a curing plan must be scientifically developed according to environmental conditions. Qinglong Group has summarized a three-stage curing method: intensive early-stage curing, moderate mid-stage curing, and natural late-stage curing.

Early-stage curing is the most critical. Within 7 days after demolding, spray water every 2-4 hours to keep the surface moist. Under standard curing conditions, Qinglong Group uses an automatic spray system to maintain ambient humidity above 95%. For panels thicker than 50mm, the curing period should be appropriately extended to 10 days to ensure full hydration.

Mid-stage curing controls strength development. During days 7-28, reduce the watering frequency to 2-3 times per day, allowing the panels to dry moderately to promote later-stage strength development. In dry, hot environments, increase the number of watering sessions to prevent plastic shrinkage cracks. Qinglong Group adjusts the curing plan in real time through surface moisture monitoring.

Late-stage curing focuses on adaptability. After 28 days, gradually reduce watering to allow the panels to reach equilibrium with their environment. Before being put into service, a 7-day natural drying period is recommended to bring the panels' moisture content below 6%. This scientific curing regime ensures the long-term performance stability of GRC panels.

0
ما متطلبات تكرار المعالجة المائية لألواح GRC؟ نظام المعالجة وتطور القوة مع تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.