Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

كيف نعالج تسرب الوصلات في جدران GRC الخارجية؟ الدليل الفني لعزل وصلات GRC من تشينغلونغ

2026-01-03 17:58:42

تصفح:

Treatment of GRC exterior wall joint leakage requires targeted measures based on the cause of leakage. Common treatment methods include: the grouting method (for crack leakage), sealant re-application (for aging failure), and the drainage method (for design defects). Before treatment, the leakage cause must be accurately diagnosed to select the correct remediation plan.

Grouting materials use epoxy resin or polyurethane grout, with grouting pressure of 0.3-0.5MPa; sealant removal width is 1.5 times the original joint width, with depth ≥10mm; drainage holes are set at 8-10mm diameter with 300-500mm spacing. At one project, joint leakage treated by grouting showed no leakage through the rainy season test, demonstrating good remediation results.

Leakage Cause Diagnosis

Determine leakage points through water spray tests, and analyze whether the cause is joint failure, improper node design, or material aging. If necessary, use an endoscope to inspect internal conditions.

Grouting Treatment Process

Grouting hole spacing is 200-300mm, grouting proceeds from bottom to top with pressure increased uniformly. After grouting, the surface is cleaned and leveled to restore the decorative effect.

Sealant Replacement

Remove aged sealant, clean the substrate thoroughly, and apply primer. New sealant thickness ≥6mm, width 1.5 times the joint width, application temperature 5-40°C.

Drainage System Improvement

Install water guide channels or drainage holes to ensure infiltrated water is discharged promptly. Drainage slope ≥5%, with drainage capacity meeting the maximum rainfall intensity requirement.

Joint leakage requires treating both symptoms and root causes. Correct diagnosis and a scientific remediation plan are the key to ensuring effective results.

0
كيف نعالج تسرب الوصلات في جدران GRC الخارجية؟ الدليل الفني لعزل وصلات GRC من تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.