Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

ما المدة النموذجية لدورة إنتاج ألواح GRC الزخرفية المخصصة؟ معايير إدارة دورة إنتاج GRC

2026-01-03 15:51:36

تصفح:

The production cycle of customized GRC decorative panels is divided into three tiers according to complexity: simple shapes (flat panels, shallow relief) 20-25 days, medium complexity (single-curved panels, medium relief) 25-30 days, and complex shapes (double-curved panels, deep relief) 30-40 days. The cycle includes design 5-7 days, mold making 7-10 days, production and curing 10-15 days, and surface treatment 3-5 days.

Qinglong GRC compresses the conventional production cycle by 15% through parallel operations and process optimization. One urgent project required delivery within 15 days; through mold standardization and optimized curing procedures, it was completed on time, resolving the project's pressing need. Production progress is available in real time, and customers can check the status of each stage through the system.

Design Cycle Control

Simple designs: 5 days; complex designs: 7 days; these controls ensure design quality.

Mold Making Time

Standard molds: 7 days; special molds: 10 days; these times ensure precision.

Production Curing Cycle

Standard molds: 10 days; expedited cycles can be shortened to 7 days; these cycles guarantee strength.

Surface Treatment Time

Standard treatment: 3 days; special effects: 5 days; these times refine the appearance.

Production cycles require scientific scheduling. Qinglong GRC delivers on time through efficient management.

0
ما المدة النموذجية لدورة إنتاج ألواح GRC الزخرفية المخصصة؟ معايير إدارة دورة إنتاج GRC
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.