Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

+86 760 8870 6348
+86 13902597531
Image display

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

资讯中心

كيف تُطبَّق التقنية الرقمية في تركيب جدران GRC الستائرية؟ تحليل نظام تقنية التركيب الذكي لـ GRC من تشينغلونغ

2025-12-29 13:10:14

تصفح:

Digital technology is profoundly transforming the way GRC curtain walls are installed, shifting from the traditional "relying on experience on site" to a new model of "factory prefabrication, digital guidance, and intelligent installation." As a technology leader in the industry, Qinglong GRC has deeply integrated digital technologies such as BIM, 3D scanning, IoT, and drones into the entire installation process, achieving comprehensive improvements in precision, efficiency, and safety.

In a GRC curtain wall project for complex curved twin towers in Qianhai, Shenzhen, Qinglong's digital installation shone brightly. Before the project began, drone oblique photography captured actual site conditions, which were compared with the BIM design model, allowing structural construction deviations to be identified and adjusted in advance. During the installation phase, each worker was equipped with a tablet running a dedicated app, enabling real-time viewing of the 3D installation position, sequence, and animation demonstrations for each panel in the BIM model. Site surveyors used high-precision total stations to directly project the 3D coordinates from the BIM model onto the structure. With this "digital twin + on-site navigation" system, nearly 20,000 irregular GRC panels were installed without a single error, the overall construction period was shortened by 30%, and installation precision errors were kept within ±2mm.

BIM Technology and Digital Pre-assembly

The BIM model is the core of digitalization. A LOD 400 model containing all geometric information, material information, and installation logic is established at the design stage. Before factory production, digital pre-assembly can be performed in a virtual environment to identify design conflicts in advance, optimize panel segmentation, and generate a unique identity code (QR code) for each panel. On-site installers can retrieve all information for a panel simply by scanning its code.

3D Scanning and On-site Reality Verification

After the main structure is completed and before installation begins, a 3D laser scanner is used to scan the site and generate a high-precision "point cloud" model. Comparing the point cloud model with the design BIM model allows for precise analysis of structural construction errors, based on which the installation coordinates of GRC panels can be dynamically adjusted in the BIM model, or a small number of panels can be fine-tuned and customized, achieving "adapting the installation to the civil structure" and avoiding on-site cutting at the source.

Intelligent Setting Out and AR-Assisted Positioning

Replacing traditional chalk line marking, robotic total stations or GNSS devices are used to directly project the contour lines, centerlines, and bracket positioning points of each GRC panel on site according to the BIM model coordinates, with precision reaching the millimeter level. A more cutting-edge technology combines augmented reality (AR) glasses, allowing installation workers to see directly in their field of view where the virtual GRC panel should be installed, achieving "what you see is what you install."

IoT and Progress & Quality Control

Sensors are installed on key tools (such as torque wrenches) to ensure bolt tightening forces meet standards, with data automatically uploaded to the cloud. Site managers use mobile terminals to update installation progress in real time, upload quality inspection photos, and record issues. All data is linked to the BIM model, enabling transparent and traceable management of progress, quality, and safety.

Digitalization is not about showing off technology; it is the fundamental way to solve pain points in GRC curtain wall installation such as "errors, omissions, clashes, deficiencies, and delays." Qinglong GRC's digital installation system makes the invisible installation process visible, controllable, and optimizable, delivering to clients not only a premium project but also a complete set of digital assets.

0
كيف تُطبَّق التقنية الرقمية في تركيب جدران GRC الستائرية؟ تحليل نظام تقنية التركيب الذكي لـ GRC من تشينغلونغ
اضغط لفترة طويلة على الصورة للحفظ / المشاركة
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

التشاور عبر الإنترنت

مرحبًا ، الرجاء النقر فوق خدمة العملاء عبر الإنترنت للتواصل عبر الإنترنت!

بيانات المتصل
Contact number
+86 13902597531
امسح رمز الاستجابة السريعة ضوئيًا
رمز الاستجابة السريعة
Scan with WeChat
  • إلغاء
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
نسخ بنجاح!
Add WeChat friend to learn more about the product
I see.