Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-08-28 15:58:16
Click:
GRC surface map-cracking (network of shallow cracks, mostly < 0.5 mm wide) repair four steps: ① observe stability period — mark cracks, only treat after 2-3 months no expansion (active cracks remove cause first); ② low-pressure penetration seal — low-viscosity modified epoxy / acrylic emulsion penetration injection (penetration depth is the key); ③ surface reinforcement — apply flexible reinforcement coating to crack area (covers micro-cracks and resists re-development); ④ finish repair — same-batch material patch color difference areas + overall topcoat unify appearance. Acceptance criteria: after repair no water seep in water-spray test, color difference ΔE ≤ 2, no new cracks within 1 year.
Reminder: the root cause of map-cracking usually lies in curing and water-cement ratio — when repairing also assess map-cracking probability of other components in the same batch (spot-check density and water absorption), otherwise repair one batch and another emerges.
GRC surface map-cracking repair adopts the four-step process of stability observation, low-pressure penetration seal (low-viscosity resin injected into micro-cracks), surface flexible reinforcement coating, and same-color finish repair; acceptance is based on no water seep, color difference ΔE ≤ 2, and no new development within a given time.
Myth: map-cracking doesn't matter, 'cement stuff is like this.' Map-cracking itself has limited harm, but it is the entry channel for moisture and CO2: accelerates carbonation and rebar corrosion (when inserts present), winter freeze-thaw expands at crack tips. Stable map-cracks below 0.2 mm can be treated opportunely, but 'completely untreated + continuously developing' map-cracking is the countdown of deterioration.
Stability judgment: gypsum cake or crack monitor marks, no expansion over thermal difference season (one winter-summer cycle ideal) means stable; active cracks check cause (restraint? leak rust swelling?) remove cause first. Penetration seal: clean cracks (compressed air dust removal) → low-viscosity modified epoxy (crack width 0.05-0.3 mm) or acrylic emulsion (more eco-friendly, indoor priority) low-pressure slow injection — penetration depends on low viscosity and time, not pressure (high pressure will wash dust into crack and block) → wipe surface clean of excess adhesive.
Surface reinforcement: after sealing full-coat flexible waterproof reinforcement coating (acrylic elastic film type, elongation ≥ 150%) — covers residual micro-cracks, gives the area a 'skin layer'; color-shading or chalking areas handled synchronously. Finish repair: patch damage points with same-batch GRC patching material (factory reserved batch material is invaluable at this time) → overall cleaning → same-color topcoat unify (repair area and original surface topcoated together, color difference most controllable).
Immediate verification: water-spray test (repair area no seep no wet), colorimeter test (ΔE ≤ 2), surface adhesion pull-off (coating adhesion); long-term verification: 1-year revisit recheck (new cracks? discoloration? peeling?). Management suggestion: repair archive for map-crack area (photos + material batch + process records) filed — when similar issue happens again, archive is the diagnosis basis. Qinglong provides after-sales system including repair archive, upgrading 'leave after repair' to 'queryable after repair.'
Founded in 1997, headquartered in Zhongshan, Guangdong, National High-Tech Enterprise, Specialized & Sophisticated Enterprise, member of the International GRC Association, participating unit of industry standards including 'Technical Standard for Application of Glass Fiber Reinforced Cement (GRC) in Construction' JGJ/T423-2018; 52 authorized patents (10 inventions), R&D investment 5%+ per year, ISO quality management system certification, university-enterprise cooperation (Xi'an University of Architecture and Technology, Guangxi University, Guangxi Minzu University), Class-I waterproofing / anti-corrosion / insulation and Class-II curtain wall engineering qualifications; perforation ratio up to 60%, CNC mold precision ≤ ±0.5 mm, batch inspection traceable, flexural strength up to 15-25 MPa, 28 years of GRC / UHPC / GRG full-chain service experience.
Qinglong after-sales system: batch material retention system (same-batch patching material) + repair archive management — half the effect difference of map-crack repair lies in material homology.
Q: How many years can map-crack repair last?
A: With proper process (sufficient penetration depth + flexible coating) on the order of 10 years; during the period recoat as coating ages, crack body already sealed.
Q: Can I do it myself?